My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009 - 00351 - new structure
Orono
>
Property Files
>
Street Address
>
W
>
Wear Lane
>
70 Wear Lane - 04-117-23-21-0019
>
Permits/Inspections
>
2009 - 00351 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:08:52 PM
Creation date
1/21/2020 9:06:14 AM
Metadata
Fields
Template:
x Address Old
House Number
70
Street Name
Wear
Street Type
Lane
Address
70 Wear La
Document Type
Permits/Inspections
PIN
0411723210019
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY of ORONO <br /> . : <br /> ( °4 Street Address: Mailing Address: <br /> O , 0 2750 Kelley Parkway PO Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> '� I�' 47 <br /> ':� ', 4.° Radon Requirements <br /> o,1` <br /> Effective June 1, 2009 <br /> Information Handout <br /> Subfloor preparation. A layer of gas-permeable material Sumps. Sump pits open to soil or serving as the <br /> shall be placed under all concrete slabs and other floor termination point for sub-slab or interior drain tile <br /> systems that directly contact the ground and are within the loops shall be covered with a gasketed or otherwise <br /> walls of the living spaces and conditioned crawl spaces of sealed lid. Sumps used as suction point in a sub-slab <br /> the building. The gas-permeable layer shall consist of one depressurization system shall have a lid designed to <br /> of the following: accommodate the vent pipe. <br /> 1. A uniform layer of clean aggregate, a minimum of Foundation walls. Hollow block masonry foundation <br /> 4 inches thick. The aggregate shall consist of walls shall be constructed with either a continuous <br /> material that will pass through a 2-inch sieve and course of solid masonry, one course of masonry <br /> be retained by a 1/4 inch sieve. grouted solid, or a solid concrete beam at or above <br /> 2. A uniform layer of sand, a minimum of 4 inches finished ground surface to prevent passage of air from <br /> thick, overlain by a layer or strips of geotextile the interior of the wall into the living space. Where a <br /> drainage matting designed to allow the lateral flow brick veneer or other masonry ledge is installed, the <br /> of soil gases. course immediately below the ledge shall be sealed. <br /> Soil-gas-retarder. A minimum of 6-mil polyethylene or Joints, cracks, or other openings around all <br /> equivalent flexible sheeting material shall be placed on top penetrations of both exterior and interior surfaces of <br /> of the gas-permeable layer prior to casting the slab or masonry block or wood foundation walls below the <br /> placing the floor assembly to serve as a soil-gas-retarder ground surface shall be filled with polyurethane caulk <br /> by bridging any cracks that develop in the slab or floor or equivalent sealant. Penetrations of concrete walls <br /> assembly and to prevent concrete from entering the void shall be filled. <br /> spaces in the aggregate base material. The sheeting shall Waterproffing/dampproffing. The exterior surfaces <br /> cover the entire floor area with separate sections of of portions of concrete and masonry block walls below <br /> sheeting lapped at least 12 inches. The sheeting shall fit the ground surface shall be dampproofed or <br /> closely around any pipe, wire or other penetrations of the waterproofed. <br /> material. All punctures or tears in the material shall be <br /> sealed or covered with additional sheeting. Ducts. Ductwork passing through or beneath a slab <br /> shall be of seamless material unless the air-handling <br /> Entry routes. system is designed to maintain continuous positive <br /> Floor openings. Openings around bathtubs, pressure within such ducting. Joints in such ductwork <br /> showers, water closets, pipes, wires or other objects shall be sealed to prevent air leakage. Ductwork <br /> that penetrate concrete slabs or other floor located in crawl spaces shall have all seams and <br /> assemblies shall be filled with a polyurethane caulk or joints sealed by closure systems. <br /> equivalent sealant. Unconditioned crawl space floors. Openings <br /> Concrete joints. All control joints, isolation joints, around all penetrations through floors above <br /> construction joints and any other joints in concrete unconditioned crawl spaces shall be caulked or <br /> otherwise filled to prevent air leakage. <br /> slabs or between slabs and foundation walls shall be <br /> sealed with a caulk or sealant. <br /> Telephone (952) 249-4600 • Fax (952) 249-4616 • www.ci.orono.mn.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.