My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010 - 00110 - escrow fee
Orono
>
Property Files
>
Street Address
>
W
>
Wear Circle
>
2875 Wear Circle - 33-118-23-34-0004
>
Permits/Inspections
>
2010 - 00110 - escrow fee
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:50:20 PM
Creation date
1/17/2020 10:42:44 AM
Metadata
Fields
Template:
x Address Old
House Number
2875
Street Name
Wear
Street Type
Circle
Address
2875 Wear Circle
Document Type
Permits/Inspections
PIN
3311823340004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O O <br /> CITY of ORONO <br /> c + �l ti Municipal Offices <br /> . I ti <br /> ','A` • Street Address: Mailing Address: <br /> Ike 040' 2750 Kelley Parkway P.O. Box 66 <br /> 5 March2010 Orono, MN 55356 Crystal Bay, MN 553230066 <br /> Joshua LaFond <br /> Son of a Carpenter, INC <br /> 1758 lhrig Ave SE <br /> Buffalo, MN 55313 <br /> Re: 2900 Watertown Road <br /> Building Permit Application#2010-0109 <br /> The City is in receipt of your building permit application received by this office on February 25, 2010. This <br /> permit for the construction of a new residence is incomplete. The following items must be revised and <br /> submitted in order for the application to be considered complete and for the plan review to continue: <br /> 1. Certificate of Survey. There is information missing from the submitted survey particularly existing <br /> topographic information extending 50 feet outside the property boundaries. Please provide an <br /> updated certificate of survey meeting all of the City's survey requirements (attached). <br /> a. Per City Code Section 18-136(a) each residential property is limited to one curb cut. Your <br /> plan shows that you are proposing to maintain the two existing curb cuts. With the <br /> redevelopment of the property all non-conformities must be brought into conformance. <br /> Please revise your plans to reflect only one curb cut. <br /> b. The survey should be revised to clarify which buildings are to be removed after the <br /> completion of the new residence. *Please note, some of the existing buildings will not <br /> conform to Code requirements once the existing principal structure is no longer the principal <br /> structure. <br /> 2. Wetland Evaluation. Please see the attached information regarding wetland evaluation. This project <br /> may trigger the administration of the City's wetland ordinance. **Please note, additional requirements <br /> and/or escrows may apply. <br /> 3. Construction Plans. The submitted construction plans are labeled "Not for Construction". The plans <br /> are reviewed for Building Permit must be the official For Construction plans. Please clarify. <br /> 4. Escrow Agreement. Please review, sign and submit the enclosed escrow agreement. Submission <br /> of the signed escrow agreement document is a requirement of permit issuance. <br /> The above information is required in order for the plan review to continue. Please feel free to contact me at <br /> mcurtisOci.orono.mn.us or 952.249.4627 if you have any questions. <br /> Sincerely, <br /> City of Orono' <br /> Afr <br /> dr <br /> Melanie Curtis <br /> Planning and Zoning Coordinator <br /> c: Sharon Guimond via email <br /> Elise Shinigawa via email <br /> enclosures <br /> Telephone(952)249-4600 • Fax(952)249-4616 <br /> www.ci.orono.mn.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.