Laserfiche WebLink
PLAN REVIEW CHECKLIST FOR NEW STRUCTURES / ADDITIONS^ <br /> Address: 2250 Weal( Ci (Cu i Permit No.: 2.013 - 0I'r2_J <br /> Description of work: PeC,C.. 15 Y.14. 7 2.25 vl . Date Rec'd: 11' 4t 15 <br /> Septic review by: Date Approved: <br /> Zoning review by: Ci011QtkIfil Date Approved: <br /> Building review by: /V O`f fQ�(//re et�7'r01 <3v ate Approved` y� /ee- A//Z ��� � <br /> Grading review by: l Date Approved: <br /> Zoning District: 12.1z- 113 Zoning File#: Reso#: Reso Date: <br /> Zoning: Lot Area: SF/AC Width: Lot Coverage: SF % <br /> Survey Submitted: 1-e .S 0 No Date of Survey: [0 '3I Revised date(?): <br /> Landscape plan submitted? 0 Yes 0 No Landscaper: <br /> Proposed Setbacks: <br /> a3D .110 <br /> Front( ,216145 Rear(S et ( N S E W ) ( N S E W ) Other Buildings Wetland <br /> Side Side <br /> Or Zto' NIS <br /> 0 Defined Height: Peak Height: FFE: FFE minus 6 feet= (Existing Contour) <br /> ph-Perimeter(linear feet) = 50% = L.F. below grade <br /> otpasement? 0 Yes 0 No, Stories <br /> FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: FOR A BUILDING ON A SLAB FOUNDATION: <br /> The distance between the lowest proposed Slab at or above grade— <br /> floor(of the basement or crawl space)and measure from highest existing <br /> START WITH the highest point of the roof. grade to the highest point of the <br /> START WITH roof even if fill was brought in to <br /> elevate home. <br /> If you have a... <br /> SUBTRACTION • GABLE OR HIPPED ROOF(no Slab below grade—measure <br /> (BASED ON windows): Subtract half the distance from highest existing grade to the <br /> ROOF TYPE) betweep the highest point of the roof highest point of the roof. <br /> to tpe low point of the corresponding If you have a... <br /> �,gaible or hipped roof SUBTRACTION • GABLE D,R-HIPPED ROOF <br /> l% GABLE OR HIPPED ROOF(with (BASED ON (no windows): Subtract half <br /> 7 windows): Subtract half the distance ROOF TYPE) <br /> the distance between the <br /> between the top of the highest ,.'highest point of the roof to <br /> window and the highest point of the / the low point of the <br /> roof <br /> / corresponding gable or <br /> / hipped roof <br /> / • ALL OTHER ROOF TYPES(flat, % • GABLE OR HIPPED ROOF <br /> / mansard,etc):No subtraction. (with windows): Subtract <br /> SUBTRACTION Subtract the distance between the half the distance between <br /> (BASED ON basement/crawl space floor and the the top of the highest <br /> EXISTING highest existing grade adjacent to the window and the highest <br /> GRADES) foundation OR 10 feet(whichever is less). point of the roof <br /> • ALL OTHER ROOF TYPES <br /> (flat,mansard,etc):No <br /> EQUALS Defined building height subtraction. <br /> Defined building height <br /> EQUALS <br /> Updated: October 2015 <br /> z:\forms\plan review checklist 10-2015.docx <br />