My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987 - Septiic System
Orono
>
Property Files
>
Street Address
>
W
>
Wear Circle
>
2845 Wear Circle- 33-118-23-34-0009
>
Septic
>
1987 - Septiic System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:50:47 PM
Creation date
1/17/2020 9:02:49 AM
Metadata
Fields
Template:
x Address Old
House Number
2845
Street Name
Wear
Street Type
Circle
Address
2845 Wear Circle
Document Type
Septic
PIN
3311823340009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> -PERFORATED - <br /> ,r_•_ • LATERALS <br /> '�. .•.r.i- _� <br /> SANDY LOAM SOIL • � rs- r-�~— •--'� <br /> r /,/,,•:,..;5--':',•~'•••' ,'/ /: • ':S; <br /> • /: i. J� ' '• <br /> LAYER OF STRAW OR • �' % / 7, / >�' <br /> MARSH HAY COVERED �.� /, <br /> WITH RED ROSIN PAPER Y - .�T. <br /> P• IPE FROM PIMP �': z / i <br /> �, r <br /> /; 077'/' a j ' <br /> 3/ „_ 2 '? „ II y/ .1/7 <br /> CLEAN ROCK ..�; • <br /> '�� �,�y, ���,' , ;” . <br /> � /' DIVERSION FOR <br /> -/.,/•• SURFACE WATER <br /> 6" TOPSOIL �' - / %/ 1. SELECT AS LEVEL A SITE AS POSSIBLE FOR THE MOUND. <br /> 3;r ``��;/ / Q. REMOVE EXCESS VEGETATION. PLOW DISK OR USING BACKHOE RAKER TEETH, <br /> ROUGFIEN THE SURFACE SOIL 6 INCHES DEEP. DO THIS ONLY IF THE MOISTURE <br /> /" , CONTENT IS LESS THAN THE PLASTIC UMIT tSOIL IS PLASTIC IF IT CAN BE ROLLED <br /> . =, INTO AN Ye INCH WIRE).DO NOT REMOVE ANY OF THE SURFACE SOIL. MOUNDCARE TO PREVENT _ <br /> • /, J pl.,w. / / / / �� PERFORMANCEPUDDLING <br /> OF LAY THE CLAY DURING CONSTRUCTIDEPENDS ON ON.DO NOT USE HEAVY CONSTRUC- <br /> / !� ION EQUIPMENT AND DO NOT CONSTRUCT THE MOUND WHEN THE CLAY SOIL IS <br /> -,:.-- :• ....s. •' / S.te/ 1 W A PLASTIC CONDITION. <br /> �'" �_� _.7/!-•' � L i / •/ 3. USE ONLY TRAGIC-TYPE EQUIPMENT FOR CONSTRUCTING THE MOUND SO AS NOT <br /> / r 9i. /- M �• TO COMPACT THE ORIGINAL. SOIL. <br /> �.� � 4. THERE MUST BE AT LEAST 2 FEET OF NATURAL OR FILL SOIL HAVING A PERCOLA- <br /> TION RATE NO SLOWER THAN 120 MINUTES PER INCH AND NO FASTER THAN 5 <br /> _ � yam_ '.`•. 1 �, /;`. MINUTES PER INCH,BEFORE PLACING THE LAYER OF CLEAN SAND <br /> / S .62 _ `� t• /.;. �' S THE 12 INCH LAYER OF CLEAN SAND IS PART OF THE MOUND CONSTRUCTION. SAND <br /> `C��o _ ---z-:.:,,,-..-.. <br /> . IS CONSIDERED CLEAN IF IT CAN PASS THE"FRUIT JAR TEST FOR CONCRETE SMD. <br /> `OPE �' ,. .. •, ,`.,. •v'•::. 6. THE TOP OF THE CLEAN SAND LAYER AND THE TOP OF THE ROCK BED MUST BE <br /> S/� /� ` `` '''•' " CONSTRUCTED LEVEL. <br /> �1 D N y 36, 1 `'�:iy;',• `-'.1,:.. 7 DISTRIBUTION PIPES ARE 1/2-INCH DIAMETER SPACED 40 INCHES ON CENTER <br /> N L cO \ CONNEIIEL TO A MANIFOLD IN THE CENTER OF THE ROCK BED. PIPES HAVE <br /> FI S D ` �^ !+ -INCH PERFORATIONS DRILLED EVERY 36 INCHES AND POINTING DOWNWARD. <br /> 1, T✓ •,, • USE A NEW DRILL BIT TO AVOID BURRS INSIDE THE PIPE. <br /> BROKE�A Ef, ; ^C -•.8. NINE INCHES OF ROCK ARE PLACED UNDER THE PERFORATED LATERALS AND 2 <br /> • INCHES ABOVE FOR A TOTAL ROCK DEPTH OF 12 INCHES. <br /> Up -~ 9. THE ROCK IS FIRST COVERED WITH A LAYER OF HAY OR STRAW WHICH 5 THEN <br /> B RN <br /> 1 ^�� •'� ~"-:•4-•: COVERED WITH A LAYER OF RED ROSIN PAPER LAPPED 6 INCHES AT THE SEAMS. <br /> A '�l/�F I0. AT LEAST fi INCHES OF LOAMY SAND SHOULD BE PLACED OVER THE TOP OF THE <br /> RR1 "EC I I. AD6-INCK BCHDLAYER OF TOP SOIL SHOULD BE PLACED OVER THE ENTIRE MOUND SO <br /> LA'rc THAT A CRASS COVER CAN BE ESTABUSHED. �1 <br /> �12. CROwN THE ABOVE THE ROCK1LAYER SO THAR AT TTHEAVY RA tJ WILL RUN 0 CENTER OF THE MOUND • <br /> • <br /> • <br /> 13. SIDE SLOPES OF THE DIKES SHOULD BE NO STEEPER THAN 4,1 ON CLAY SOILS <br /> AND 3,1 ON SANDY SOILS. <br /> t4. D -LAYER.DEPENDS ON THE AMOUNT-OF DAILY <br /> SE f). <br /> 15. MAXIMUM EFFLUENT DOSE PER PUMP CYCLE SHOULD BE NO MORE THE TABLE <br /> VALUES. <br /> 16. MINIMUM PUMPING RATE IS SHOWN IN TABLE PUMPING HEAD MUST BE <br /> ADEQUATE TO OVERCOME ELEVATION DIFFERENCE, FRICTION LOSS PLUS 5 FEET <br />
The URL can be used to link to this page
Your browser does not support the video tag.