My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999 - Septic System
Orono
>
Property Files
>
Street Address
>
W
>
Wear Circle
>
2845 Wear Circle- 33-118-23-34-0009
>
Septic
>
1999 - Septic System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:50:47 PM
Creation date
1/17/2020 8:52:38 AM
Metadata
Fields
Template:
x Address Old
House Number
2845
Street Name
Wear
Street Type
Circle
Address
2845 Wear Circle
Document Type
Septic
PIN
3311823340009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> PUMP SELECTION PROCEDURE <br /> A. Determine pump capadty: <br /> Gravity Distribution <br /> 1. Minimum suggested is 20 gpm <br /> 2. Maximum suggested is 45 gpm Perforation Discharges in GPM <br /> Head Perforation diameter <br /> Pressure Distibution (feet) (inches) <br /> 3. a. Select number of perforated laterals 3 7/32 1/4 <br /> b. Select perforation spacing= Z. feet. 1.0a 036' . 0.74 <br /> c. Subtract 2 ft. from the rock layer length. 13 0.69 0.90 <br /> 2.0b 0.80 1.04 <br /> - -2 ft._ ,S-3 feet. <br /> • <br /> Writ b'C� a Use 1.0 foot single <br /> d. Determine the number of spaces between perforations. b Use 2.0 feet for single homes.thing else. <br /> Length pert.spacing=,Sl_ft.+ ft.=-L2-spaces <br /> e. 1') spaces +1 ....,1:__ perforations/lateral <br /> f. Multiply perforations per lateral bynumberof laterals to <br /> get total number of perforations. .t. x ;1'1_perforations. • <br /> g. O x =-�4-gpm. <br /> SELECI l;U PUMP CAPACITY L.1) gpm <br /> B.Determine head requiremenb: <br /> 1. Elevation difference between pump and point of discharge. <br /> `4 feet <br /> 2. If pumping to a pressure distribution system,five feet for pressure Soil°"°""" 'r <br /> required at manifold if gravity system,zero. =MN <br /> S feet pipe;a t% /0e <br /> 3. Friction loss <br /> a. Enter friction loss table with gpm and pipe diameter. »--- Veva don DiAesv+ca <br /> Read friction loss in feet per 100 feet from table(F-14). Pip' r <br /> • <br /> F.L. _ 2.i.`+ ft/100 ft of pipe v <br /> z <br /> b. Determine total pipe length from pump to discharge :........_. . <br /> point. Estimate by adding 25 percent to pipe length for fitting <br /> loss, or use a fitting loss chart(F-15 feet). <br /> Equivalent pipe len)th- 1.25 times pi a length= <br /> (O-a x 1.25= feet Friction Loss in Plastic Pipe <br /> c. Calculate total friction loss by multiplying Nominal <br /> friction loss in ft/100 ft by equivalent pipe length. pipe dial <br /> Total friction loss= ' , 1,,L-1 x <4 1 +100= - feet Flow Rate <br /> 4. Total head required is the sum of elevation difference, • gpm 1.5" 2" 3" <br /> special head requirements,and total friction loss. <br /> 20 2.47 0.73 0.11 <br /> + + 2 25 3.73 1.11 0.16 <br /> (1) (2) (3c) 30 5.2.3 1.55 0.23 <br /> 35 6.96 20& 0.30 <br /> TOTAL HEAD IS.; feet <br /> 8.91 0.39 <br /> .28 feet 45- 11.07 3 0.48 <br /> 50 13.46 3.99 038 <br /> 55 4.76 0.70 <br /> C. Pump selection 60 5.60 0.82 <br /> 65 6.48 0.95 <br /> • <br /> 70 7.44 1.09 <br /> 1. A pump must be selected to deliver at least <br /> Li D gpm (Step A) with at least --LC_feet of total heath (Step B). <br />
The URL can be used to link to this page
Your browser does not support the video tag.