Laserfiche WebLink
CITY OF ORONO SEPTIC SYSTEM PEMNELT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, N N 55323 <br /> ADDRESS: :2- �.�=� a,...l <br /> JOB SI <br /> TE . <br /> Occupancy Type: ResidentialCommercial Others <br /> Permit Type: New or Replacement System, $100.00 <br /> 50 00 ' <br /> Repair Existing System, <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees <br /> :`See fee schedule for non-residential permit fees <br /> T ' <br /> Owner's Name: _S d Tr ��6 ti _ PhoneNumber: <br /> zip <br /> IYiailing Address: _ City: <br /> Tt P SFl°� <br /> Contractors Name• 4� X� PhoneNumber: 5 79-• �� y <br /> y� ►✓ 9 rysity: <br /> Nsiailing Address: aS ca R D 90 C /lVAplf ,PAZ.✓ <br /> DO NOT ItiIAIL PAYiN- ENT WITH THIS APPLICATION <br /> GENERAL hNSTRUCTIONS . <br /> in person at the City <br /> 1. Applications for septic system permits may be mailed or submitted <br /> Offices; however, permits will not be.mailed out. The permit must be picked up in <br /> person at the City Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet signed by the City Inspector. <br /> 4, The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. is required <br /> C. Drainfield trench installation prior to covering. For mounds, inspection <br /> after rough-up but prior to sand placement (sand will be jar tested for silt content), <br /> and again during pressure distribution piping installation in t rock be , <br /> D. Final inspection to verify proper final cover depths and to verifypdthat all ump station <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holding MPCA Installer Certificate shall be present during inspections- A 24- <br /> hour notice is required for all inspections. <br />