rv. °1V0. <br /> t CITYofORONO <br /> ,sk <br /> • , ', `.; I , G~ RESOLUTION OF THE CITY COUNCIL <br /> 9kESHO4v NO. <br /> f) Developer shall provide record plan sets for all utility construction in a timely <br /> manner. <br /> 5. Wetland Impacts <br /> a) Orono's 26'wetland setback requirement(Zoning Code Section 10.55,Subd. <br /> 8) which disallows filling, grading, dredging, excavation, hardcover, <br /> temporary or permanent structures,obstructions,septic systems,wells or other <br /> construction, is in effect on the site. Final grading and site plans, Sheets <br /> C3.1 through C3.10 and C2.1, indicate those locations where grading or <br /> filling within the 26' setback is necessary to accomplish the Plan. <br /> b) A variance to Section 10.55, Subd.8 is hereby granted to allow the minimal <br /> filling within the 26'wetland setbacks where buildings abut the 26' setback <br /> line as shown on the approved plan sheets. A wetland setback variance is <br /> hereby granted for encroachment ofbuildings,retaining walls,roadways,trails <br /> and hardcover within the 26'wetland setback as depicted on Sheets C2.1 and <br /> C3.8 through C3.10. <br /> c) The City specifically acknowledges that 1.05 acres of City protected wetland <br /> are to be filled or otherwise impacted as part of the project. The Developer <br /> shall comply with all requirements of the MCWD in regards to mitigation and <br /> protection of wetlands on the site. <br /> 6. Grading, Erosion Control <br /> a) Erosion control shall adhere to "Best Management Practices for Protecting <br /> Water Quality in Urban Areas". <br /> b) The Developer shall comply with all conditions enumerated in the Erosion <br /> Control memo by Bonestroo &Associates dated October 3, 2002. <br /> c) All erosion control measures as required by the City and the MCWD shall be <br /> in place, inspected and approved by the City Engineer prior to commencing <br /> excavation on the site. <br /> d) All such erosion control measures shall be maintained in working order prior <br /> to,during and after the project until released by the City Engineer, subject to <br /> weekly inspection or as necessary until the site is revegetated. <br /> Page 10 of 18 <br />