My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-09-2008 Council Work Session Minutes
Orono
>
City Council
>
Minutes
>
Historical
>
1974-2024 Minutes - work sessions
>
2008
>
12-09-2008 Council Work Session Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 2:04:14 PM
Creation date
1/15/2020 2:04:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
o City will not pay for undergrounding utilities, but it will it pay for street <br /> reconstruction and underlying sewer and water work. <br /> o Outline options for paying for undergrounding utilities. <br /> ■ City won't front-end the project. <br /> ■ Everyone has to buy-in. <br /> o Undergrounding utilities won't solve the outage problems and doesn't need to <br /> be done at the same time as the street project. <br /> • Kellogg will be present. <br /> • The only efficiencies to undergrounding utilities with the street reconstruction <br /> project would be strategically locating conduit. New technology makes installing <br /> conduit easier, so there is not as much benefit to installing at the same time as the <br /> street project. <br /> • The remaining discussion will be directed mostly to the Xcel representative. <br /> b. Funding and Final Design Specifics <br /> • No comments were received from Council regarding the draft feasibility report. <br /> • Kellogg will prepare a final draft with a few minor changes and revised numbers. <br /> • Electronic copy will be provided of the final report so it can be put on the website. <br /> • Pg 20 of feasibility report is a summary of the costs. Further analysis was done since <br /> the last meeting. The biggest wildcard is drainage/stormwater improvements. <br /> • 36 properties with drainage issues have been identified and prioritized by: <br /> i. highest level of severity <br /> ii. where severe erosion is created <br /> iii. if it would solve a regional problem <br /> iv. if the issue is detrimental to structures <br /> • Drainage issues are divided into 3 categories: <br /> i. Those that will be addressed with the street project <br /> ii. Those that are recommended to be included in the street project <br /> iii. Those that are optional and could be scheduled in a city-wide improvement plan <br /> • Scott, Don, and Jared reviewed the 36 issues to determine the most critical to be <br /> done at this time, which involves approximately $300,000 in additional project costs. <br /> • No project costs are included for easements. <br /> • There are limited resources for funding. Drainage issues that can't be included with <br /> this project would be put on the capital improvement plan for the next 5-10 years. <br /> • Any areas marked with blue on the maps are identified as ponding, filtration areas, <br /> or rain gardens to help with lake water quality. <br /> • The "Drainage Issues Cost Summary' sheet will be included in final feasibility report <br /> but in another format to indicate priority of drainage issues. <br /> • The street reconstruction plan costs are $3.1 million. Additional money for sewer, <br /> water and storm sewer improvements is needed. <br /> • 2008 street projects were under budget approximately $500,000. This money can <br /> be used to offset some of the costs. <br /> • Water improvements—some money is left from the bond proceeds and could be <br /> used as well as the $500,000 remaining from the 2008 street project. The water <br />
The URL can be used to link to this page
Your browser does not support the video tag.