My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011 - 01410 - roofing
Orono
>
Property Files
>
Street Address
>
W
>
Wayzata Boulevard West
>
2350 Wayzata Boulevard West - 34-118-23-22-0014
>
Permits/Inspections
>
2011 - 01410 - roofing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:56:21 PM
Creation date
1/15/2020 1:02:59 PM
Metadata
Fields
Template:
x Address Old
House Number
2350
Street Name
Wayzata
Street Type
Boulevard
Street Direction
West
Address
2350 Wayzata Boulevard West
Document Type
Permits/Inspections
PIN
3411823220014
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/07/2011 15: 03 9524738080 DALBEC ROOFING PAGE 03/03 <br /> IDDALBEC <br /> ROOFING <br /> Scope of Work for Roofing at: <br /> 2350 Wayzata Boulevard <br /> Orono, MN <br /> Roof Section#2-Upper Office Roof <br /> We propose to furnish the necessary labor, material and equipment required to do the reroofing <br /> above named project as follows: <br /> Ballasted EPDM with a Partial Tear-Off <br /> DEMOLITION <br /> • Vacuum existing gravel and dispose of. <br /> • Remove the existing membrane and membrane flashings and dispose of. <br /> • Remove the existing sheet metal coping and dispose of. <br /> • Remove all deleted and abandoned curbs. Building owner to decide which penetrations, <br /> if any, are removed. <br /> WOOD BLOCKING <br /> • Supply and install a 6"x 6" wood cant on existing wood blocking on perimeter. <br /> INSULATION <br /> • Insert tapered crickets between drains to help alleviate some of the evidence of ponding <br /> water that has occurred. <br /> ROOFING <br /> • Supply and loose lay a 60 mil LPUM membrane over insulation. <br /> • At all horizontal to vertical transitions supply and install a reinforced perimeter fastening <br /> strip. <br /> • Supply and install 60 mil EPDM membrane flashings up and over the canted parapet. At <br /> roof to wall conditions extend EPDM flashings up approximately 12"and adhere to <br /> substrate utilizing neoprene based bonding adhesive. <br /> • Supply and install flashings at all pipe penetrations utilizing pre-fabricated methods. If <br /> pre-fabricated methods cannot be used, we will utilize field fabricated methods. <br /> MISCELLANEOUS <br /> • Supply and install river rock ballast at a rate of 10 lbs. per square foot. <br /> • Supply and install 2' x 2' x 2" pavers at two sides of the roof hatch and at the five (5) <br /> HVAC units. <br /> SHEET METAL <br /> • Supply and install new 24 ga. prefinished sheet metal to include: canted edge and fascia <br /> with cover plates,4 spill out scuppers and counter flashings. <br /> 2285 Daniels Street ■ Long Lake, MN 55356 ■ Phone: (952)473-8080 • Fax: (952)473-0805 <br />
The URL can be used to link to this page
Your browser does not support the video tag.