My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-17-2018 Planning Commission Packet
Orono
>
Planning Commission
>
2018
>
09-17-2018 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 11:02:21 AM
Creation date
1/15/2020 11:01:09 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project file data <br />Name: <br />Size: <br />Modified: <br />i ime zone: <br />Reference number: <br />Description: <br />Comment 1: <br />Comment 2: <br />Comment 3: <br />Coordinate System <br />C:\Users\user\Documents\Business Center - HCE\2655 N Name: <br />Shore Dr.vice <br />Datum: <br />2 MB <br />Zone: <br />7/3/2018 8:27:19 AM (UTC: -5) <br />Geoid: <br />Central Standard Time <br />Vertical datum: <br />Calibrated site: <br />Mass Earthwork Analysis <br />Default <br />WGS 1984 <br />Default <br />Volumes for Entire Site (yd3) <br />Area of Interest <br />Available Bank Cut <br />Compacted Fill <br />Required <br />Excess/Deficit <br />Entire Site <br />2,046.4 1,648.4 397.9 <br />The mass earthwork analysis for the entire site, considering bank volumes only, indicates a requirement for offsite waste of excess material. <br />Excess volume: 397.9 yd' <br />
The URL can be used to link to this page
Your browser does not support the video tag.