My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-17-2018 Planning Commission Packet
Orono
>
Planning Commission
>
2018
>
09-17-2018 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 11:02:21 AM
Creation date
1/15/2020 11:01:09 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Preliminary PlatNpnlication 16-3822 <br />�• �� Eisinger Meadows <br />V Page 3 <br />5.0 EROSION AND SEDIMENT CONTROL PLAN: <br />5.1 General SWPPP Notcs should he revised to indicate. a'runimum 6 -topsoil used fOr rc-spread. <br />5.2 Notes should he revised to indicate perimeter erosion control measures and protection 11211('ino v ill <br />he installed by Contr�ictur and inspected by City prior to any demol�itior or land disturbance_ <br />Contractor must prm ide 24 hour notice �hrior to inspection. <br />5.3 I1'the proposed pertianent stol"noxater hasin will be used as it tempcnrar,, sediment <br />basin durin, construction, additional seyuencing notes anal linework should be included as <br />necessary to provide clear direction for installation schedule of periancler sediment control devises, <br />temporary sediment basin, rough grading and temporary d�4chin,:, temporary seeding. utility and <br />street construction, site stabilization 611cludim-1 topsoil i spread, erosmil control blanket, riprap <br />and permanent ve-letati <br />on), removal of perimeter measwR'S, c10fls RICti011 sediment rernoviil, outlet <br />control structure installation, and permanent st ahilization of the ponds. <br />5.4 Double siltfenc must be provided adjacent to wetland; where grading i; proposed withl�,n 50' 01 <br />the wetland. <br />6.0 SANITARY SEWER AND WATF,R MAIN PLAN <br />6.1 Sanitary sewer and watcrmain review, comments will be provided separately as plan do~,cl,;)pmcnt <br />Progresses. <br />7.0 STORM SEWER PLAN <br />7.1 Subsurface drainr.le service connection; should he provided for all lots 1101, directly abultirg a pond <br />or wetland. Storm sewer layout and Drainage and Ulility Easements may need to be aciJusted <br />accordingly. <br />7.2 CBMH-1 should be constructed with it 4' sump to prOwide preU-eatrlie] It I)rlmr to the pond/filtrati:On <br />basin. <br />7.3 Clcanouts 1'01- the Filtration basin undcrdram should be provided. Clea110U[S should be located a1)OVC <br />the high water Icvcl to limit potential fur hypassing f1kration system. <br />8.0 LANDSCAPE PLAN <br />K. I Since common bul'kthorn is identified in the Conservation Desk'n Master Plan (CDIVIP} for 1eni0v, 1, <br />the Final Landscape Plan should indicate areal, of buckthorn reni0val and incorporate re vulval <br />�(uidelines outlined in the CDMP. <br />8.2 Various proposed tree (.;cations will need 10 be adjusted L) ren -love conf-licl with utilities. <br />Please let me know if` you have any yuesti011s 0r need additional infor illation. <br />Sincerely, <br />BOLTON & MENK, INC. <br />Robert E. Bean, Jr., P.E. <br />Water Resources Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.