My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-17-2018 Planning Commission Packet
Orono
>
Planning Commission
>
2018
>
09-17-2018 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 11:02:21 AM
Creation date
1/15/2020 11:01:09 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LA18-000071 <br />September 17, 2018 <br />Page 4 of 4 <br />15) Not detrimental to the public health, public safety, or general welfare; The <br />Applicant will be required to keep debris off of the public roadways. The noise <br />resulting from the trucks hauling and equipment moving the material in and <br />around the site should be minimized to the extent possible. The grading project <br />will be monitored by the City Engineer and planning staff so as to minimize <br />nuisances during the project. <br />A CUP may be granted subject to such conditions as the Council may prescribe. Additionally, <br />a CUP shall remain in effect as long as the conditions imposed by the City Council are <br />observed, but nothing in this section shall prevent the city from enacting or amending official <br />controls to change the status of conditional uses. <br />Practical Difficulties Statement <br />Applicant has completed the Practical Difficulties Documentation Form attached as Exhibit B, and <br />should be asked for additional testimony regarding the application. <br />Conditional Use Permit Analysis <br />Staff finds the requirements for a land alterations conditional use permit are met. The owner <br />needed to correct existing poor soils on the site. This created the need for excess fill. The <br />applicant is working to create a walkout lot for the property which is cohesive with the <br />neighborhood. A new engineered grade was created as well for the property allowing the <br />proposed home to meet the height requirements per City Code. The applicant was able to use <br />some of the removed soil to fill in various areas to create a new walk out style lot limited the <br />amount of hauling needed for the project. The applicant has received a Minnehaha Creek <br />Watershed Permit for the proposed new home. <br />Public Comments <br />To date, no public comments have been received. <br />Issues for Consideration <br />1. Does the Planning Commission find that that the property owner proposes to use the <br />property in a reasonable manner which is not permitted by an official control? <br />2. Are there any other issues or concerns with this application? <br />Planning Staff Recommendation <br />Planning staff recommends approval. <br />List of Exhibits <br />Exhibit A. <br />Application <br />Exhibit B. <br />Proposed Survey/Site Plan <br />Exhibit C. <br />Proposed Plans and Elevations <br />Exhibit D. <br />Submitted Hardcover Calculations and Grading Calcs <br />Exhibit E. <br />Narrative <br />Exhibit F. <br />Property Owners List and Map <br />
The URL can be used to link to this page
Your browser does not support the video tag.