My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015 - 00214 - roofing
Orono
>
Property Files
>
Street Address
>
W
>
Wayzata Boulevard West
>
2250 Wayzata Boulevard West - 34-118-23-22-0023 - Well No 3 Pumphouse
>
Permits/Inspections
>
2015 - 00214 - roofing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:56:25 PM
Creation date
1/15/2020 9:30:41 AM
Metadata
Fields
Template:
x Address Old
House Number
2250
Street Name
Wayzata
Street Type
Boulevard
Street Direction
West
Address
2250 Wayzata Boulevard West
Document Type
Permits/Inspections
PIN
3411823220023
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(c) For joints sealed with non-elastomeric sealants and calking compounds,fill joints to a depth in <br /> the range of 75%to 125%of joint width. <br /> 3.2 SCHEDULE OF SEALANT APPLICATION: <br /> A. At joints in vertical planes on exterior of building and interior face of through expansion or control <br /> joints,provide non-sag type polyurethane or silicone sealant. <br /> B. At joints in horizontal planes on interior and exterior of building,provide self-leveling type <br /> polyurethane sealant. <br /> C. At joints on interior of building,except as indicated in item A above,provide acrylic type sealant. <br /> D. At perimeter of plumbing fixtures,and kitchen equipment provide silicone type sealant. <br /> E. Set all thresholds in full bed of urethane type caulking. <br /> F. All chlorine rooms,all electrical rooms adjoining classified areas(e.q.pretreatment,digester control <br /> etc.) <br /> 1. All walls fully sealed to the structure top and bottom and shall not allow migration of gasses or <br /> moisture. <br /> 2. Sealant around all electrical outlets,panel boxes,etc. <br /> 3. Expandable foam around sides and back of all electrical outlets,panel boxes,etc. <br /> 4. AlI openings,into computer and electrical room,into access floor space,and into space above <br /> ceiling shall be completely sealed. <br /> ****END OF SECTION**** <br /> C 13.108617-Orono,MN CAULKING AND SEALANTS <br /> Water Treatment System Improvements PAGE 07900-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.