My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015 - 00214 - roofing
Orono
>
Property Files
>
Street Address
>
W
>
Wayzata Boulevard West
>
2250 Wayzata Boulevard West - 34-118-23-22-0023 - Well No 3 Pumphouse
>
Permits/Inspections
>
2015 - 00214 - roofing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:56:25 PM
Creation date
1/15/2020 9:30:41 AM
Metadata
Fields
Template:
x Address Old
House Number
2250
Street Name
Wayzata
Street Type
Boulevard
Street Direction
West
Address
2250 Wayzata Boulevard West
Document Type
Permits/Inspections
PIN
3411823220023
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 07500-ROOF SYSTEM <br /> PART 1--GENERAL <br /> 1.1 SUMMARY <br /> A. Work specified in this section shall include all materials,labor,administration and facilities required to <br /> furnish and install a roof system as shown on the plans and specified. <br /> 1.2 RELATED SECTIONS <br /> A. Section 06100(Wood Roof Edge and Curbs)—Rough Carpentry <br /> B. Section 07600—Sheet Metal Work <br /> 1.3 QUALITY ASSURANCE <br /> A. Submittals <br /> 1. Submit samples as requested by Engineer. <br /> 2. Manufacturer's written product information,installation instructions and guarantee information. <br /> 3. Indicate seam locations,perimeter and penetration details and plan of roof walkways. <br /> 4. All submittals must be on file at the Engineer's office before roof system may be installed. <br /> B. Certificates <br /> 1. Manufacturers to submit an independent test lab report stating compliance with specification <br /> requirements and have the report dated within the last six(6)months. <br /> C. Contractor's Qualifications <br /> 1. The insulation and roof membrane shall only be applied in strict compliance with the <br /> manufacturer's written instruction by factory trained and approved roofing contractors familiar <br /> with the products. <br /> 1.4 PRODUCT DELIVERY,STORAGE AND HANDLING <br /> A. Make no deliveries to project until ready to install or approved storage is provided. <br /> B. Deliver materials to project site in manufacturer's original unopened packaging and rolls. <br /> C. Identify contents,manufacturer,brand name,thermal values,and applicable standards. <br /> D. Store materials in area protected from weather,moisture,open flame or sparks and according to <br /> manufacturer's written instructions and codes. <br /> E. Handle materials to prevent damage and remove damaged materials from site. <br /> 1.5 ENVIRONMENTAL REQUIREMENTS <br /> A. Do not install roof system during rain or wet weather or when surfaces are wet. <br /> B. Do not apply roof system when air temperature is below manufacturer's recommendations. <br /> C13.108617-Orono,MN ROOF SYSTEM <br /> Water Treatment System Improvements PAGE 07500-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.