My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-20-2018 Planning Commission Packet
Orono
>
Planning Commission
>
2018
>
08-20-2018 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 8:45:39 AM
Creation date
1/15/2020 8:25:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FILE # LA18-000068 <br />August 20, 2018 <br />Page 3 of 5 <br />Road Improvements and/or Easements Needed. Assuming the road would be private, the <br />City will require a Road, Drainage and Utilities Easement over the private road, which <br />should be platted as an outlot and designed and built to City private road standards. <br />Standard perimeter drainage and utility easements around all property boundaries as well <br />as conservation and flowage easements over the delineated wetlands will be required. <br />Remedy: Plat outlot, prepare easement if private. <br />Parks, Trails, Sidewalks. No sidewalks or trails are proposed. Based on the comprehensive <br />trail plan, no trails are recommended. <br />Park Dedication. Since this is a proposed plat, versus a subdivision, no park dedication <br />will be required. <br />Stormwater and Drainage Improvements & Fees. Stormwater plans have not been <br />developed at this stage. Stormwater will need to be managed as required by the Watershed <br />District. <br />The project will be subject to the Stormwater and Drainage Trunk Fee (SW&DT Fee). <br />Final calculation of the fee would be based on the final lot count. If for example the <br />development results in I lot at 0.5 acres, the SW&DT Fee would be $6,050 lots per the <br />2018 Orono Fee Schedule. <br />Utility Locations/Availability/Assessments/Connection Fees. It is not stated, but it is <br />assumed that the property will connect to sanitary sewer services. A SAC connection fee <br />will be required at the time of connection. Extension of the sewer will be the responsibility <br />pf the development. <br />Municipal Water does not serve the property. A well will need to be drilled. <br />It is assumed that all other utilities will be underground and located within easements. This <br />will need to be verified. Remedy: Confirm easement authority to extend utilities to <br />property. <br />Wetlands. It appears that a portion of the western shore is impacted by wetlands. A <br />delineation will need to be completed as part of the preliminary plat. The MCWD will <br />likely require a buffer of some width, which may impact access and building sites. Wetland <br />buffers may be included in lot area calculations, but not the wetlands themselves. Remedy: <br />Delineate wetland, to be approved by Minnehaha Creek Watershed District, adjust <br />lot area as necessary. <br />Tree and/or Woodland Impacts. The site plan indicates several large cottonwood trees on <br />the property, many of which will be removed to accommodate construction. <br />Conservation Design. Conservation design is not required because this is a proposed plat, <br />not a proposed subdivision. : <br />
The URL can be used to link to this page
Your browser does not support the video tag.