Laserfiche WebLink
FILE # LA18-000062 <br />16 July 2018 <br />Page 3 of 4 <br />standpoint to a reduced distance of be 45-50 feet (adequate length to accommodate a school <br />bus). The 30 mph road will only serve 5 lots, so there should not be a need to support a queue <br />of vehicles. <br />If there are any changes needed the applicant can respond to those prior to placement on the <br />City Council agenda. Ultimately, the developer should prepare a final plat application which <br />responds to and incorporates these recommendations. <br />Easements <br />Drainage & Utility. The City requires standard perimeter drainage and utility easements around <br />all property boundaries in the Plat and drainage easements over the wetland areas. The <br />easements are not shown on the proposed preliminary plat drawing; the Final Plat must meet <br />the City standards. <br />Drainage and Utility Easements are required over any stormwater facilities that may be required <br />by the Minnehaha Creek Watershed District. <br />Private Road. The property is proposed to be served via a private road with a minimum 24 -foot <br />width to be contained within a 50 -foot wide outlot with a platted 100 -foot cul-de-sac. Road, <br />Drainage and Utility easements shall be granted over the entirety of this outlot. Access <br />easements shall be provided over the outlot/private road for each of proposed lots; a <br />maintenance agreement for the private road should also be provided by the developer. <br />Park Dedication <br />The City has no plans for trails that may specifically require dedication of land from this <br />property. The Park Fee is determined as 8% of the fair market value of the land being <br />subdivided, but must be between a minimum of $3,250 and a maximum of $5,550 per <br />residential dwelling unit. For the proposed development, the Park Fee would be based only on <br />the newly created lots (3 new lots). The City's Assessor will be consulted to determine the <br />market value of the land for establishing the amount of the fee. <br />Stormwater and Drainage Improvements <br />The developer should coordinate with the MCWD and provide confirmation regarding the <br />permits or approvals they will require for this subdivision. According to the Anderson <br />Engineering report, conservation easements will protect the wetland buffer areas as required by <br />the MCWD. Additionally, according to the report, there will be two stormwater infiltration <br />basins installed, the grading plan should be updated to reflect the pond areas. Placement and <br />sizing will be determined by the Minnehaha Creek Watershed District Rules. <br />The development is subject to the 2018 Stormwater and Drainage Trunk Fee of $4,030.00 per <br />acre. For the 2 -acre zoning districts, any lot exceeding 2.0 gross acres, including wetland, shall <br />be charged a maximum trunk fee equal to the trunk fee for a 2.0 acre parcel. Therefore $4,030 x <br />10 [5 lots x 2.0 = 10.0 total acres] = $40,300.00. <br />Utility Locations and Availability <br />The subject property is not located within the Metropolitan Urban Service Area (MUSA). <br />Therefore City sewer is not available to the property. They have provided septic system designs <br />