My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-16-2018 Planning Commission Packet
Orono
>
Planning Commission
>
2018
>
04-16-2018 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:54:11 PM
Creation date
1/14/2020 3:27:06 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Site Plan Application #LA18-000034 <br />2635 Kelley Parkway <br />Page 2 <br />11. Extent of removals at connections to existing pavement shall be coordinated in the field with <br />the City prior to any work. Concrete sidewalk removal limits shall be located at a joint. <br />12. Pedestrian ramps must be provided on the sidewalk adjacent to Kelley Parkway at the <br />connections to the driveway entrances. <br />13. The Grading Notes must be revised to indicate a minimum 6" topsoil replacement on disturbed <br />green areas. <br />14. Retaining wall plans must be provided for review and approval prior to their construction. <br />15. A fence should be provided on walls 4' or greater in height, and details should be included <br />accordingly. <br />16. Once the sanitary sewer stub is exposed and location, size, and elevation are field verified, <br />layout and design of service connection must be submitted to City for review and approval <br />prior to construction. <br />17. In order to limit potential for sewer blockages, a grinder pump should be included prior to <br />connection to public sanitary sewer. <br />18. The hydrant on the south side of the building should be relocated to the south side of the fire <br />lane to minimize potential for issues with falling walls during firefighting operations. <br />19. The final location of fire hydrants, valves, and fire connections must be reviewed by the Fire <br />Chief. <br />20. Due to the short distance and drop in elevation, all joints between CBMH 102 and FES 101 <br />should be tied. <br />21. FES 101 should be relocated to the NWL (+/-1009.0), and the incoming pipe should be <br />installed with minimal slope to maintain the lowest velocity possible and minimize erosion <br />potential. <br />22. Sump manholes should be included prior to connection to the regional pond or trunk sewer to <br />limit potential transport of sediment to the regional stormwater management system. <br />23. Due to heavy soils in the area, the applicant should consider installing finger drains at low point <br />inlets (per detail provided). <br />24. Riprap installed should be Class III per detail provided. Notes should be included accordingly. <br />25. Signs should be provided for manholes, gate valves, and flared -end sections in the area east of <br />the retaining wall to mark utilities if grass is not mowed here (see Comment 26). <br />26. The final locations of trees should be coordinated to avoid conflict with utilities. The tree in the <br />island north of the entrance appears to be in conflict with proposed storm sewer. <br />27. Native vegetation should be indicated in the area east of the retaining wall and adjacent to the <br />regional pond to minimize the need for maintenance or mowing in this area. <br />28. The Contractor should be required to submit a Site Management Plan prior to work. The plan <br />should outline concrete management, work that will require dewatering, and any other work <br />requiring protective measures to minimize potential for negative environmental impact. <br />29. The Contractor should be required to submit a Traffic Control Plan prior to work. <br />30. The applicant will be required to obtain Minnehaha Creek Watershed District (MCWD) <br />approval and permitting. A copy of any approvals or permits required should be submitted <br />conditional to Final approval. <br />31. The applicant will be required to obtain a General Construction Permit (NPDES) to discharge <br />stormwater associated with construction activity since more than 1 acre will be disturbed. A <br />copy of the permit should be submitted prior to any land disturbing activity. <br />32. The applicant will be required to submit a Maintenance Agreement for all stormwater <br />management structures and facilities. The agreement should define maintenance <br />responsibilities following completion of project, specify types and frequencies of inspection <br />and maintenance activities, and designate who will conduct inspection and maintenance <br />activities. <br />33. Record drawings must be submitted upon completion of the project. <br />H:\ORNO\C13115486\z-LA18-000034_2635 Kelley Parkway\2635KelleyPkwy-1_2018-04-09.docx <br />Bolton & Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.