Laserfiche WebLink
MINUTES OF THE PARK COMMISSION MEETING OF FEBRUARY 13, 1992 <br /> 1992 OBA SCHEDULE - CONT. <br /> Larson indicated they would be irrigated , with that issue being the <br /> most difficult to resolve . He did state that when the ice arena <br /> is built , the Hockey Association will be required to connect to <br /> municipal sewer and water , and at that point , the OBA may be able <br /> to connect to the municipal system. <br /> Chair Flint stated he was bothered by additional accesses on to <br /> County Road 6 . <br /> Johnston indicated separate accesses may not be necessary to serve <br /> both facilities . <br /> Larson advised that he would seek an estimate from the contractor <br /> working on the City facilities for the excavation of the fields . <br /> He stated they wou I d I i ke to be ab l e to p I ant the grass seed i n the <br /> spring of 1992 . <br /> Chair Flint asked if the fields would be ready for use for the 1993 <br /> season and Larson felt they could be ready. <br /> Larson announced a Joint Park Commission meeting to be held on <br /> February 25 , 1992 , which will be not-specific to this site , but <br /> rather cover an overall plan . <br /> Ilse felt that meeting could be used to present this proposal . <br /> Johnston observed it may be a year before the field has matured to <br /> a point of use and felt they could wait on development of the <br /> parking lot untit such time. He noted that the City requires <br /> commercial businesses to provide a paved parking lot and felt that <br /> the OBA may be required to provide a paved lot also. <br /> Chair Flint asked about the proposed future building for the <br /> school . <br /> Larson explained that is for long range planning , and will be <br /> realized only if the school district grows . He stated the school <br /> is preparing for a bond issue to be used for the general fund , <br /> which may provide funds for this project . <br /> Ilse asked if the cost could be estimated by the meeting of <br /> February 25th . <br /> Larson stated that when the ice arena was proposed for the site , <br /> the excavation cost was estimated at $36 ,000, which also involved <br /> footings for the building . <br /> 4 <br />