Laserfiche WebLink
OPERATION <br /> O PNEUMATIC O ELECTRIC Q HYDRAULIC <br /> PIPING SUPERVISED O YES ONO DETECTING MEDIA SUPERVISED ❑ YES O NO <br /> DOES VALVE OPERATE FROM THE MANUAL TRIP ANO/OR REMOTE CONTROL STATIONS O YES O NO <br /> DELUGE& I AN ACC SIL CILI IN AC CIRCUI C` SING I NO, XPLAIN <br /> PREACTION <br /> VALVES O YES O NO <br /> DOES EACH CIRCUIT OPERATE DOES EACH CIRCUIT MAXIMUM IM i O <br /> MAKE MODEL SUPERVISION LOSS ALARM OPERATE VALVE RELEASEOPERATE RELEASE <br /> _ <br /> YES NO YES NO MIN. SEC. <br /> HOP•i e <br /> HYDROSTATIC'Hydrostatic teats shall be Trade at not less than 200 psi(13.8 bars)for two hours or 50 cel(3.4 bars)above static pressure In excess <br /> of 150 pat(10.2 bars)for two hours.Differential dry-pre valve dappers shall be len open during test to prevent damage.All aboveground piping eaxage <br /> TEST shall be stopped. <br /> DESCRIPTION <br /> PNFtJMATIC_Establish 40 psi(2.7 bars)air pressure and measure drop which shad not exceed 1.1/2 psi(0.1 bars)in 24 hours.Test pressure <br /> lanes at normal water level and air pressure and measure air pressure drop*hien shad not exceed 1.1/2 Del at baral In 24 hours. <br /> ALL PIPING HYDROSTATICALLY TESTED AT•2-00 PSi FOR Z. HRS. IF NO.STATE REASON <br /> ORY PIPING PNEUMATICALLY TESTED C YES O NO <br /> ECUIPMENT OPERATES PROPERLY O YES O NO <br /> DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT ADDITIVES AND CORROSIVE CHEMICALS.SCCIUM SILICATE OR <br /> DERIVATIVES OF SODIUM SILICATE.BRINE.OR OTHER CORROSIVE CHEMICALS WERE NOT USED FOR TESTING SYSTEMS CR <br /> TESTS STOPPING LEAKS? XY£S O NO <br /> DRAIN l REAOING CF GAGE LOCATED NEAR WATER RESIDUAL PRESSURE WITH VALVE IN TEST <br /> TEST JI SUPPLY TEST CONNECTION: PSI CONNECTION OPEN WIDE PSI <br /> UNOERGROUNO MAINS AND LEAD IN CONNECTIONS TO SYSTEM RISERS FLUSHED BEFORE CONNECTION MACE TO SPRINKLER PIPING. <br /> VERIFIED BY COPY OF THE U FORM NO.858 C YES O NO OTHER EXPLAIN <br /> FLUSHED BY INSTALLER OF UNDER- <br /> GROUND SPRINKLER PIPING ,,YES O NO <br /> BUNK TESTING NUMBER USED LOCATIONS <br /> NUMBER REMOVED <br /> GASKETS NONE <br /> WELDED PIPING >�rES O NO <br /> /' IF YES... <br /> DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING PROCEDURES COMPLY <br /> WITH THE RECUIREMENTS OF AT LEAST AWS 010.9.LEVEL AR-3 JIKeES O NO <br /> WELDING CO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS CUALIFIED IN <br /> COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWS 010.9.LEVEL AR-3 )YES O NO <br /> CO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A <br /> DOCUMENTED QUALITY CONTROL PROCEDURE TO INSURE THAT ALL DISCS APE <br /> RETRIEVED,THAT OPENINGS IN PIPING ARE SMOOTH.THAT SLAG AND OTHER <br /> WELDING RESIDUE ARE REMOVED.ANO THAT THE INTERNAL DIAMETERS OF <br /> PIPING ARE NOT PENETRATED /ES 0 NO <br /> CUTOUTS DO YOU CERTIFY THAT YOU HAVE A CONTROL FEATURE TO ENSURE THAT ALL <br /> (DISCS) CUTOUTS(DISCS)ARE RETRIEVED? gES ONO <br /> HYDRAULIC NAME PLATE PROVIDED IF NO,EXPLAIN <br /> DATA <br /> NAMEPLATE ICYES 0 NO <br /> DATE LEFT IN SEP E WITH ALL CONTROL VALVES OPEN: <br /> REMARKS <br /> NAME OF SPRINKLER CONTRACTOR <br /> OLSFN FIRE PRC7TFT`PTCN THC'_ <br /> TESTS WITNESSED BY <br /> SIGNATURES y <br /> FOR QOPERT�-! °7 `�Y OWNERs (SIGNED) TITLE GATE / <br /> . ca.,�_ I F. Mays1 .o.,( I S-I2o QQ <br /> FOR SPRI IKLER CONTRA To• (SI .NED) TITLE DATE <br /> ADDITIONAL EXPLANATION AND NOTES 7 1 <br /> p5A awl( <br />