Laserfiche WebLink
' � f <br /> ' Feb. 8, 1983 BIKEWAYS -43- <br /> ' <br /> XI. BIKEWAY PLANS PREPARED BY LOCAL 3. Plans shall include a leqend showing conventional <br /> ' GOVERNMENTAL AGENCIES siqns and symbols used in the plans. <br /> Bikeway plans prepared by local qovernmental aqencies B. TITLE SHEET shall include: <br /> for funding thru Mn/DOT proqrams will be processed by <br /> � the State Aid Office and the Office of Environmental 1. Description Block <br /> Services. <br /> a. Type of work; bicycle route, bicycle lanes or <br /> ' Plans for projects within cities of over 5,000 population bicycle path. <br /> shall be prepared (or reviewed) and siqned by the City <br /> Enqineer (if the bikeway is on a county road, the plan shall b. Hiqhway (CSAH or MSASH) number, or street <br /> also be siqned by the County Enqineer). For other areas name. <br /> ' plans shall be prepared (or reviewed) and siqned by the <br /> County Enqineer. Official Mn/DOT contact will be with the c. Project number. <br /> city or county enqineer. Plans shall then be submitted to <br /> the appropriate Mn/DOT District State Aid Enqineer and d. Geoqraphic location of each project - name, <br /> ' thence to the Office of State Aid in St. Paul, distance and direction from intersectinq hiqhways or towns. <br /> Plans must be approved before award of contract to be e. Leqal Description - land ties to extremities of each <br /> ' eliqible for funding. project. <br /> An enqineer's estimate shall be submitted with the f. Lenqth of each project in feet and miles (indi- <br /> plans, consistinq of a list of pay items, the unit price for catinq qross lenqth, bridqe lenqths, exceptions and net <br /> � each item, the extension for each item and the qrand total. lenqths) carried to exact chained footage and to three <br /> decimal points in mileaqe. All bridges are considered ex- <br /> Projects involvinq Federal Aid shall follow the reqular ceptions if previously constructed. <br /> federal aid proqramminq sequence. <br /> , 2. Index maps shall clearly portray the project location <br /> The purpose of a set of Construction Plans is to deline- and shall include: <br /> ate the contemplated work with sufficient details of desiqn, <br /> ' supplemented with tabulation of summary of quantities, a. Stationinq and project number at beqinninq and <br /> in such a manner that it can be clearly interpreted by en- end of project. <br /> qineers and contractors. The onqinals serve as a permanent <br /> record of the project and must provide sufficient data b. Distance and direction to at least one incorporated <br /> ' to enable the contractor to make an intelliqent bid and to municipality. <br /> perform the work as intended. Clarity and conciseness <br /> are essential so as to avoid misrepresentation. Unnecessary c. Bridqe number, stationinq and lenqth in feet <br /> ' details should be avoided. and miles to each bndge. <br /> Plans shall be prepared in accordance with Mn/DOT d. Secuon, township and ranqe. <br /> Technical Manual sections 5-292.600, Mn/DOT State <br /> , Aid Manual section 5-892.200 and the following: NOTE: If a scale is shown, use a bar qraph that will <br /> change when plan size is changed by reduction proces�nq. <br /> A. GENERAL <br /> 3. Index of Sheets. Title sheet shall be sheet number 1. <br /> ' i. All projects shall have a State Aid Project Number, Sheets shali be numbered consecutively. <br /> this number may be obtained by calling the Office of <br /> State Aid. The project No. (e.q. S.A.P. 87-623-04) 4. Specification Reference (latest edition of Mn/DOT <br /> , shall be shown on the lower right hand comer of all plan Standard Specifications for Hiqhway Construction). <br /> sheets. <br /> 5. Present and Projected (20 Year) Averaqe Daily <br /> 2. Ptan size shall be 8-1/2" x 11", 11" x 17" or 22" x Traffic of roadway for Bicycle Route and Bicycle Lane <br /> 34". (We do not have facilities for processing any other projects. <br /> sized plans). Plans that are 11" x 17" or 22" x 34" shall <br /> be on translucent material capable of maltinq clear ozalid 6. Standard Siqnature Block and Enqineer's Certification <br /> pnnts. Do not use "Stick Up"on final plans. Block. <br /> ' <br />