My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987 - MPCA
Orono
>
Property Files
>
Street Address
>
W
>
Wayzata Boulevard West
>
2160 Wayzata Boulevard West - 34-118-23-21-0002
>
Correspondence
>
1987 - MPCA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:53:57 PM
Creation date
1/13/2020 10:58:41 AM
Metadata
Fields
Template:
x Address Old
House Number
2160
Street Name
Wayzata
Street Type
Boulevard
Street Direction
West
Address
2160 Wayzata Boulevard West
Document Type
Correspondence
PIN
3411823210002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-3- <br /> continuing the RI . In meeting the requirements of this paragraph the <br /> Undersigned agree to conduct free product removal in such a manner that <br /> such actions do not spread contamination into previously uncontaminated <br /> areas through untreated discharge or improper disposal techniques and to <br /> handle any flammable or ignitable products in a legal , safe, and competent <br /> manner to prevent fires or explosions. <br /> VII. Remedial Investigation Report <br /> By April 1, 1988 the Undersigned agree to submit a RI report containing <br /> the RI information and corrective action plan as described in Parts II <br /> and III of the PTR. <br /> VIII . Notification of Key Events <br /> The Undersigned agree to notify Kenneth LeVoir, the MPCA Project Leader, <br /> via telephone of key events relating to the RI. Notice should be given <br /> as soon as possible after an event is scheduled or rescheduled. Key <br /> events may include, but are not limited to: <br /> - Tank and line integrity testing <br /> - Soil borings and/or sampling <br /> - Monitoring well installation <br /> - Monitoring well sampling <br /> - Product recovery <br /> - Tank repair, removal , or lining <br /> - Soil excavation <br />
The URL can be used to link to this page
Your browser does not support the video tag.