My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CUP & Development #2C
Orono
>
Property Files
>
Street Address
>
W
>
Wayzata Boulevard West
>
2060 Wayzata Boulevard West - (Common Area & Units)
>
2060 Wayzata Blvd W - 34-118-23-24-0072 - (Unit 400/450)
>
Land Use
>
CUP & Development #2C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:55:54 PM
Creation date
1/13/2020 10:29:48 AM
Metadata
Fields
Template:
x Address Old
House Number
2060
Street Name
Wayzata
Street Type
Boulevard
Street Direction
West
Address
2060 Wayzata Blvd W
Document Type
Land Use
PIN
3411823210040
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Improvements: In accordance with the policies and ordinances of the City, the <br /> following described public or private improvements (hereinafter collectively called the <br /> "Improvements") shall be constructed, installed and maintained by the Developer <br /> according to the terms and conditions contained in this Agreement: <br /> A. Site grading, roadways and driveways, curb and gutter, parking lots, sidewalks, <br /> retaining walls and all necessary erosion control measures per the approved <br /> Grading and Drainage Plans (hereinafter called "site grading improvements"); <br /> B. Construction of sanitary sewer and water connections, and construction of storm <br /> sewer lines and facilities as required (hereinafter called "stormwater <br /> improvements") per the Utility Plan referenced herein. A drainage and utility <br /> easement shall be dedicated over entire Lot 6 as part of the final plat. <br /> C. Underground natural gas, electric, cable and telephone service to be arranged by <br /> the Developer with the utility companies involved (hereinafter called the "other <br /> utility improvements"); <br /> D. Landscaping and site revegetation improvements per the approved Landscape <br /> Plan referenced herein(hereinafter called"landscaping improvements"). <br /> E. Traffic control signage subject to approval by the City Engineer and Public <br /> Services Director. <br /> F. Any additional improvements listed within the Site Improvements Cost Estimate <br /> attached hereto as Exhibit A(the"Estimate"). <br /> 7. Construction of Improvements <br /> A. Commencement Date — Construction of Improvements shall begin no later than <br /> B. Completion Date — All Improvements shall be completed no later than <br /> —ltAN 6 W, 2X)OI (2 years after start date). The Developer may, <br /> however, request an extension of time from the City. If an extension is granted,it <br /> shall be conditioned upon updating the security posted by the Developer to reflect <br /> cost increases and the extended completion date. <br /> C. Contractors — The Developer shall select, retain and supervise the contractor(s) <br /> responsible for construction of the Improvements. The City reserves the right to <br /> require satisfactory proof of successful experience and adequate financial status of <br /> each such contractor. Where required by City ordinance,the contractor shall first <br /> obtain a license from the City. <br /> D. Pre-Construction Conference — Prior to the start of any construction, the <br /> Developer and the developer's contractor shall meet with the responsible City <br /> officials to review construction plans and schedules. <br /> Developer Initial?;�� <br /> City Clerk Initial . <br /> Page 4 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.