Laserfiche WebLink
Minnehaha Creek Watershed District <br /> Improving Quality of Water, Quality of Life <br /> iray Freshwater Center <br /> Iwys.15&19,Navarre <br /> July 31, 2002 <br /> tail: <br /> 500 Shadywood Road <br /> lxcelslor,MN 55331.9578 Frank Dunbar <br /> 'hone:(952)471-0590 5000 Glenwood Avenue, Suite 200 <br /> Minneapolis, MN 55422 <br /> 'ex:(952)471-0682 <br /> RE: Permit# 01-366, Hwy 12 & Brown Rd. Development, Long Lake <br /> ;mail: <br /> dmineminnehahacreek.org Dear Frank: <br /> kb Site: During a routine inspection by the Minnehaha Creek Watershed District (MCWD) <br /> Iww.minnehahacreek.org staff at the above mentioned location, the following violations of permit application <br /> #01-366 were observed and recorded on July 26, 2002: <br /> • Unapproved use of a non-gravel construction enterance contributing to <br /> excessive sediment deposition and collection on Brown Rd. <br /> ;oard of Managers • Lack of storm drain BMP's in association with new Bituminous surfaces on site <br /> 'amela G.BIM Based on reasonable concerns expressed by Dan Saiko, Project Manager, the <br /> ames Calkins MCWD has agreed to allow the temporary use of the construction entrance without <br /> ance Fisher adding a gravel pad, shown in green and labeled 'area of concern' on the attached <br /> Aonlca Gross site map, based on the following agreed conditions: <br /> icott Thomas • Use of entrance on an as needed basis until conditions allow for access to rear <br /> iichard Millar of building around the West side. At this point, use of temporary construction <br /> lobed Schroeder entrance will be completely closed off by silt fence and no longer will considered <br /> an acceptable entrance by the MCWD. <br /> • Daily scrape of sediment off sidewalk and street by means of bobcat or any <br /> necessary action required to remove sediment. <br /> Please note that entrance is considered temporary and access will be allowed on <br /> the conditional basis. Conditions of use will change if MCWD feels that these <br /> terms are not being met. Additionally, an on site meeting outlining these items was <br /> conducted with Dan Saiko on July 31, 2002. MCWD will be required to increase <br /> monitoring of this site to ensure that these conditions are being met, allowing for <br /> the possibility of Rule J fees to be enforced. <br /> Pitd.on recycled paper conmhdng <br /> gatd. <br /> £B/Za'd E890T2A7ET9 113HSZIB.Ldr1 >18SJ1S HHiHBNNIW £2:0T E00E—ZT-9f1d <br />