Laserfiche WebLink
PUD NO. 2C AGREEMENT AND <br /> DEVELOPMENT CONTRACT <br /> EXHIBIT A - SITE IMPROVEMENTS COST ESTIMATE <br /> 3/26/2007 . <br /> Amber Woods Office Center Plat 07-3250 <br /> Cost Estimate for Financial Guarantee (150%) <br /> Sanitary Sewer Improvements Units Qty $/Unit Total <br /> Mobilization LS 1 $ 5,000.00 $5,000.00 <br /> Traffic Control LS 1 $ 1,000.00 $1,000.00 <br /> Connect to Existing 8" Sanitary Sewer EA 1 $ 2,500.00 $2,500.00 <br /> 8" PVC Sanitary Sewer LF 360 $ 30.00 $10,800.00 <br /> 8"X 6"Wye EA 5 $ 100.00 $500.00 <br /> 4' Diameter Sanitary Sewer Manhole EA 4 $ 2,000.00 $8,000.00 <br /> 4' Diameter Sanitary Sewer Manhole Overdepth LF 22 $ 100.00 $2,200.00 <br /> Improved Pipe Foundation LF 400 $ 1.00 $400.00 <br /> Estimated Construction Cost $30,400.00 <br /> Water Main Improvements Units Qty $/Unit Total <br /> Remove Existing Watermain Pipe LF 200 $ 6.00 $1,200.00 <br /> Remove Hydrant EA 2 $ 600.00 $1,200.00 <br /> Connect to Existing Water Main EA 2 $ 2,500.00 $5,000.00 <br /> 8" DIP Water Main LF 760 $ 40.00 $30,400.00 <br /> 6" DIP Water Main LF 85 $ 30.00 $2,550.00 <br /> 8" Fittings EA 15 $ 250.00 $3,750.00 <br /> Insulation SY 10 $ 10.00 $100.00 <br /> Hydrant EA 3 $ 2,500.00 $7,500.00 <br /> 8" Gv and Box EA 2 $ 1,300.00 $2,600.00 <br /> 6" Gv and Box EA 3 $ 1,200.00 $3,600.00 <br /> • <br /> Estimated Construction Cost $57,900.00 <br /> Services Improvements Units Qty $/Unit Total <br /> 6" PVC, Service Pipe LF 355 $ 22.00 $7,810.00 <br /> 1.5 inch copper service LF 305 $ 16.00 $4,880.00 <br /> 1.5 inch corp EA 5 $ 200.00 $1,000.00 <br /> 1.5 inch curb stop EA 5 $ 250.00 $1,250.00 <br /> Estimated Construction Cost $14,940.00 <br />