Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
N <br />L0 <br />N <br />V) <br />ni r°r= <br />MMU <br />3"VENT ' <br />® STACK UP <br />J <br />Q <br />11 <br />3/4" CW <br />UP TO <br />FLOOR AB <br />U <br />C <br />N <br />O <br />iZ <br />E <br />0 <br />U <br />0 <br />r - <br />O <br />O <br />N <br />O <br />FREEZE -PROOF <br />LOCKABLE WALL <br />HYDRANT <br />RUN 3/4" <br />V'=_ <br />HW, CW & RECIRC. HW <br />LOCATION <br />UP TO FLOORS ABOVE - REFER TO <br />STORAGE <br />CAPACITY <br />GALLONS <br />2/M1. <br />REMARKS <br />WH -1 <br />1-1/2- <br />WASTE DN. <br />20 <br />FROM ABOVE <br />WATER CLOSET <br />4 <br />CLEAN-OUT IN <br />1/2 <br />- <br />JOISTS SPACE <br />F-2 <br />LAVATORY <br />1-1/2 <br />1-1/2 <br />1/2 <br />_ 4' WASTE DN. <br />WATER H1 <br />F-3 <br />FROM ABOVE <br />3 <br />1i <br />3" WASTE ROUGH -IN <br />3/4 <br />ABOVE <br />FOR FUTURE WATER <br />TENANT <br />CLOSET ON FLR. ABV <br />FLOOF <br />C' <br />+ U PIPING <br />i <br />INJOIST <br />SPACE- , - <br />n <br />2' <br />BUILDING <br />CLEAN-OUT <br />CLEAN-OUT IN <br />JOISTS SPACE 4" WASTE TO— <br />JOISTS FROM <br />BUILDING <br />1 PLUMBING <br />M1 J SCALE: 1/8" =11-031 <br />11 OPTIONAL <br />r ELEVATOR <br />11 BY OTHERS <br />fHAkIn <br />M <br />I <br />RUN 3/4" HW, CW & RECIRC. HW - <br />UP TO FLOORS ABOVE - REFER TO <br />2/M1. <br />" 1-1/2" WASTE DN.—\ <br />FROM ABOVE <br />`y -•_ CLEAN-OUT IN <br />JOISTS SPACE <br />AK' <br />off <br />d <br />4" WASTE DN. _ <br />OPTIONAL FROM ABOVE <br />ELEV. EQ. <br />UY OTHERS 3WASTE ROUGH -IN <br />FOR FUTURE WATER <br />CLOSET ON FLR. ABV. <br />I <br />WATER <br />METER <br />FLOOR: i <br />CO +' X <br />i RUN PIPING <br />IN JOIST j <br />SPACE <br />1-1/2" WATER <br />SERVICE TO <br />BUILDING BY <br />OTHERS <br />PLAN - <br />3" VENT <br />STACK UP <br />3/4" CW = <br />UP TO <br />FLOOR ABV. <br />1-1/2' WASTE DN. <br />& 1-1/2" VENT UP— <br />CLEAN-OUT IN <br />JOISTS SPACE 4" WASTE STACK DN.- <br />3"T LEVEL 3/4' CW UP FROM BELOW. <br />VALVE &CAP FOR FUTURE <br />WATER CLOSET. EXTEND / <br />1/2" CW UP TO FLOOR --� <br />ABOVE <br />3" VENT UP <br />WASTE & VENT <br />ELECTRIC WATER HEATER <br />WATER <br />HEATER <br />NO. <br />LOCATION <br />SERVICE <br />STORAGE <br />CAPACITY <br />GALLONS <br />ELECTRICAL <br />REMARKS <br />WH -1 <br />BASEMENT <br />SINKS <br />20 <br />115/60/1 <br />WATER CLOSET <br />4 <br />2 <br />1/2 <br />- <br />F-2 <br />PROVIDE 3/4" HW, CW & <br />RECIRCULATING HW UP FROM <br />BELOW W/ 1/2- VALVED & <br />CAPPED TAKE -OFFS FOR <br />FUTURE LAVATORY THIS FLOOR. <br />EXTEND 1/2- HW & CW UP TO <br />FLOOR ABOVE <br />f "f 3 x.) : is <br />Qol <br />LOFT -.INE <br />ABOVE <br />3" WASTE ROUGH -IN <br />FOR FUTURE WATER <br />CLOSET ON FLOOR <br />ABOVE <br />1 2E <br />1 <br />r <br />r OPTIONAL <br />1` ELEVATOR <br />rl BY OTHERS <br />0 C7 <br />I) <br />2� PLUMBING PLAN - <br />M1 J SCALE: 1/8"=1'-0" <br />SUPPLY <br />/ �TE <br />1 PLUMBING RISER DIAGRAMS �, WA <br />Mi NO SCALE <br />=UTURE RECIRCULATING <br />-IW PUMP <br />RELIEF <br />VALVE <br />PLUMBING FIXTURE <br />PIPING <br />FIXTURE <br />PIPE SIZE (INCHES) <br />REMARKS <br />NO. <br />TYPE <br />W. <br />V. <br />C. W. <br />H.W. <br />F-1 <br />WATER CLOSET <br />4 <br />2 <br />1/2 <br />- <br />F-2 <br />LAVATORY <br />1-1/2 <br />1-1/2 <br />1/2 <br />1/2 <br />F-3 <br />JANITORS SINK <br />3 <br />2 <br />3/4 <br />3/4 <br />ABOVE <br />PROVIDE 3/4' HW, CW & <br />RECIRCULATING HW UP FROM <br />BELOW W/ 1/2- VALVED & <br />CAPPED TAKE -OFFS FOR <br />FUTURE LAVATORY THIS FLOOR. <br />EXTEND 1/2" HW & CW UP TO <br />FLOOR ABOVE <br />� <br />t <br />3" WASTE ROUGH -IN <br />FOR FUTURE WATER <br />CLOSET ON FLOOR <br />ABOVE <br />TENANT <br />F I <br />20. I <br />IN LEVEL <br />1-1/2" WASTE DN. '\' <br />& 1-1/2" VENT UPS <br />3" VENT STACK <br />1 /2" CW UP FROM <br />BELOW. VALVE & <br />CAP FOR FUTURE <br />WATER CLOSET a WASTE DN.- <br />& 4" VENT UP <br />= I a I e, <br />Ira mit � <br />PROVIDE 1/2' HW & CW <br />UP FROM BELOW. VALVE <br />& CAP FOR FUTURE <br />LAVATORY <br />4" V.T.R. <br />1-1/2' WASTE DN. <br />-& 1-1/2" VENT UP <br />4" WASTE STACK DN. <br />3/4' CW UP FROM BELOW. <br />VALVE & CAP FOR FUTURE <br />WATER CLOSET. EXTEND <br />1/2' CW UP TO FLOOR <br />ABOVE <br />3" VENT UP <br />LOFT -LINE <br />ABOVE <br />MECHANICAL SPECIFICATIONS <br />GENERAL <br />The Mechanical Work includes work as indicated on the drawings to provide complete plumbing systems installations. <br />Provide all construction engineering, supervision, labor, material and any and all items necessary for complete <br />and functioning installations. <br />Comply with all Owner requirements. <br />Obtain all permits required for the Mechanical Work and arrange for inspections as required by the city <br />Inspection Department. <br />Pay all sales taxes, fees, permit and other costs pertaining to the Mechanical Work. <br />Coordinate the Mechanical Work with the General Contractor and other sub—contractors. <br />All work is to be performed in a craftsmanship manner, and except where otherwise indicated, using only new, <br />quality materials. <br />Do all cutting and patching necessary for the installation of the Mechanical Work. All cutting shall be done in a <br />manner directed by the General Contractor. Patching shall match adjacent surfaces. <br />All electrical power wiring will be furnished and installed by the Electrical Contractor. <br />Make on operating test of the completed installations and remedy all defects disclosed as a result of the test. <br />Guarantee all workmanship and material against defects for at least one year from the date of Owner's <br />acceptance. <br />PLUMBING <br />Waste and vent piping in building above and below ground to be schedule 40 PVC DWV pipe and drainage <br />fittings. <br />Water piping above grade to be Type L hard drawn copper tubing and wrought copper solder fittings joined <br />using 95-5 Bridgit solder. Short connections to fixtures and equipment may be Type L soft drawn copper. <br />Underground water service piping shall be Type K, soft drawn seamless copper tubing. Underground branch <br />piping shall be Type K, soft drawn or PEX. Joints will not be permitted in buried piping. <br />Fumish and install valves required to isolote fixtures, equipment and segments of the piping systems. Valves <br />shall be ball type. <br />Support piping from structure with adjustable hangers. <br />Fumish and install floor drains where indicated on the Drawings. Floor drains shall be Josom 30003—AJ, cast <br />iron body, bottom outlet, backwater valve, nickel bronze round adjustable strainer. <br />Furnish and install deanouts. Floor cleanouts shall be constructed with frame and cover threaded for 2" vertical <br />adjustment, cast iron round frame and cover. <br />Pitch horizontal waste piping 1/4' per foot where possible, but in no cost less than 1/8" per foot. <br />Through—the—roof extensions of soil and waste stocks shall terminate 12 inches above the roof. <br />F-1 Water Closet: American Standard "Cadet 3", 16-1/2" high floor set vitreous china, 12" rough—in, siphon jet, <br />1.6 GPF elongated flush tank. Seat: Olsonite 95—CC—SS, or approved equal, white solid plastic seat, open front, <br />check hinge, for elongated bowl. Closet waste fitting with neoprene gasket. <br />F-2 Lavatory. American Standard "Luceme", 19 5/8" x 16 3/4' x 6" deep vitreous china, self rimming sink <br />with overflow. Chicago model 802—V336CP deck mounted, vandal resistant self—closing faucet with 0.5 GPM <br />flow, P trop and supplies and loose key handle angle stops. <br />Disinfect the complete water piping system in accordance with Minnesota Health Department recommended <br />procedures. <br />Treat the system with chlorine and flush with clean water. Open and close all affected valves during the <br />disinfecting period. Repeat as necessary to pass required bacteriological tests. <br />Insulate all above ground water piping with Armstrong AP Armaflex foamed tubing insulation, 3/4" thick. <br />FIXTURE INSTALLATIONS <br />Fixtures shall be owner furnished, set in place and property connected, complete in every detail, <br />to soil, waste, vent and water pipes. Fixtures shall be rigid, set plumb, level and true. <br />Furnish and install all brackets, plates, braces and/or reinforcing angles as required to support wall <br />hung plumbing fixtures. Supporting membe-s shot[ ;)e rigidly attached to the walls and wall structures. <br />Particular care shall be exercised in hanging fixtures, especially lavatories, to _assure rigidity and <br />permanence. This Contractor will be held responsible for the secure mounting of lavatories on the <br />hangers and any breakage resulting from improper installation of any fixture. <br />Correctly faced inlets for fixtures shall be provided. Branches of sell, waste and vent pipe shall be <br />extended as dose to fixtures as possible. Branches of vent pipes shall be graded to the trap. <br />Fixture wastes, other than water closets and trap standard fixtures, shall be connected to waste <br />lines with an iron ferrule and threaded pipe. <br />Mounting heights as required by local building code w/ Jurisdiction. <br />Provide 20 year white silicone caulk between the back edges of vitreous china fixtures and adjoining well surfaces. <br />:.� j <br />N <br />1 <br />r OPTIONAL <br />1 ELEVATOR <br />it BY OTHERS <br />PROVIDE 1/2" HW & CW <br />UP FROM BELOW. VALVE <br />& CAP FOR FUTURE <br />LAVATORY <br />r <br />til <br />4" V.T.R. <br />1-1/2 - <br />-1/2" WASTE DN. <br />,--& 1-1/2" VENT UP <br />---3" VENT STACK <br />—1/2- CW UP FROM <br />BELOW. VALVE & <br />CAP FOR FUTURE <br />4' WASTE DN. WATER CLOSET <br />& e VENT UP <br />Palo <br />Drafting / Design <br />Residential & Commercial <br />Design & Construction Plans <br />14208 US Hwy 12 E. <br />Cokato, Mn. <br />55321 <br />Business: 320) 286-6133 <br />Toll Free: 877) 517-6133 <br />Fax: (20) 286-3230 <br />After Hours: (320) 275-3082 <br />Email: lehto—tim0yahoo.com <br />DISCLAIMER: <br />PALO COMPANIES ASSUMES NO RESPONSIBILITIES <br />FOR THE DRAWINGS ON THIS SHEET. A CLIENT <br />WHO PURCHASES THiS DOCUMENT IS RESPONSIBLE <br />FOR MEETING ALL LOCAL, STATE & FEDERAL LAWS <br />ASSOCIATED WITH TYPE OF WORK REPRESENTED <br />ON THIS SHEET. EMPLOYEES OF PALO COMPANIES <br />ARE NOT ARCHITECTS OR ENGINEERS AND ASSUME <br />NO SUCH RESPONSIBILITIES. <br />IF A CLIENT WISHES, <br />PALO COMPANIES CAN CONTACT ARCHITECTS & <br />ENGINEERS WHO WILL REVIEW AND CERTIFY <br />DOCUMENTS THAT DO COMPLY WITH ALL LOCAL, <br />STATE & FEDERAL BUILDING CODES & LAWS. THE <br />EEM FOR SUCH DOCUMENTS ARE NOT INCLUDED <br />IN PALO COMPANIES BIDS OR ESTIMATES. <br />I hereby certify that this pian, <br />specification or report was pre— <br />pared by me or under my direct <br />supervision and that I am a duly <br />Licensed Master Plumber <br />under the laws of the State of <br />Minnesota. <br />Edward S. Lehto <br />Date.• 12/14/07 Reg. No.• 5693PM <br />C"J <br />N <br />LO <br />V w <br />O <br />LM <br />0 <br />®� <br />> <br />�m OCD <br />� c a <br />Oc�co <br />® CL <br />cc�— <br />E� <br />"Q tV Z 0.. <br />PROJECT 07-017 <br />DRAWN TEL <br />DATE 12/14/07 <br />REVISIONS <br />M1 <br />SHEET 1 OF 1 <br />ll �'� Z(o �� yza/tel Gc� <br />