My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4860
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2765 Kelley Parkway - 33-118-23-12-0002
>
Resolutions
>
Resolution 4860
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:35 PM
Creation date
1/7/2020 11:17:15 AM
Metadata
Fields
Template:
x Address Old
House Number
2765
Street Name
Kelley
Street Type
Parkway
Address
2765 Kelley Parkway
Document Type
Resolutions
PIN
3311823120002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� ,t <br /> � O� ' <br /> • O , O <br /> � .^ C ITY of ORONO <br /> r'� � ` `br.. � <br /> ,�,,� , , G,�ti <br /> RESOLUTION OF THE CITY COUNCIL <br /> ��kESII�4� � NO. � � � � <br /> 5) Parking lot construction plans, including confirmation that pazking <br /> lots and driving lanes will be paved and provided with concrete <br /> curb and gutter; and that all driving lanes within parking lots shall <br /> have a 9-ton minimum pavement section. A geotechnical evaluation <br /> of the soil shall be done in conjunction with the pavement design <br /> and shall be submitted to the City Engineer for approval. <br /> 6) Detailed signage and lighting plans. <br /> 7) Any additional plans and specifications deemed necessary by the <br /> City as review progresses. <br /> D. Development Agreement. Development Approval is contingent upon the <br /> successful execution of a Development Agreement between the applicant <br /> . � and the City. Such Agreement shall address all specific City requirements � <br /> • for the development. � � <br /> E. Financial Guarantee. The Development� Agreement shall include a <br /> financial guarantee by the applicant to ensure the completion of site <br /> improvements. The City Engineer shall complete an estimate of <br /> improvement costs, including but not limited to landscaping, grading, <br /> erosion control, utilities, driveways and parking areas, trails, sidewalks, <br /> retaining walls and stormwater management facility construction, and the <br /> � applicant shall provide to the City a financial guazantee of 150% of the <br /> improvement costs. <br /> F. Storm Water and Drainage Trunk Fee. The standard Storm Water and <br /> . Drainage Trunk Fee for commercial development shall be paid by the <br /> developer at the rate of$6,480 per acre (2002 Fee Schedule). The City <br /> • Council shall determine prior to final Development Plan approval whether <br /> the Developer will be charged additional fees for off-site stormwater <br /> improvements that benefit this property. The Storm Water and Drainage <br /> Trunk Fee shall not be charged for the acreage within the Adjacent Parcel <br /> that is to be developed to serve the property; said Fee for the acreage in � <br /> the Adjacent Parcel shall be charged at the time the Adjacent Parcel is <br /> developed. � <br /> � <br /> ' Page 9 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.