My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4890
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2765 Kelley Parkway - 33-118-23-12-0002
>
Resolutions
>
Resolution 4890
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:35 PM
Creation date
1/7/2020 11:16:57 AM
Metadata
Fields
Template:
x Address Old
House Number
2765
Street Name
Kelley
Street Type
Parkway
Address
2765 Kelley Parkway
Document Type
Resolutions
PIN
3311823120002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> o� <br /> i � �. � <br /> - 1 � CITY of ORONO <br /> ,� � � - � <br /> -;. � <br /> � RESOLUTION OF THE CITY COUNCIL <br /> �� Gti <br /> ��kESI3�g'� NO. � � � � � <br /> 3. Payment of Sewer and Water Connection Charges in the amount to be calculated <br /> prior to issuance of any Site ImprovementBuilding Permits. Final amount will be <br /> based on the following formula: . � <br /> .Connection Charge Due= A-2 x 2.004 acres x $14,115/acre . <br /> A <br /> where: A=number of SAC units required for the office building � <br /> � 2=number of sewer/water units paid previously <br /> 2.004 acres=gross area of the Property � <br /> $14,115 = per-acre connection fees for 1989 Highway 12 municipal <br /> sewer&water project per 2002 City Fee Schedule.) <br /> 4. Granting to the City of public easements over existing and proposed trails and <br /> sidewalks within the Property and the Adjacent Parcel: <br /> � WHEREAS, Ci staff and consultants have reviewed the lans for this PUD � <br /> tY P <br /> application and hereby specify approval of each attached plan and identify them as part of the official � <br /> record for Planned Unit Development No. 3: <br /> 1. Approval of site plan per"Preliminary Site Plan"Sheet C2.1 dated 9/18/02, subject <br /> to potential relocation to a location within the Property of the trail currentlyproposed <br /> within the Highway 12 right-of-way. <br /> 2. Approval of"Preliminary Grading Plan"per Sheet C3.1 dated 9/18/02,subj ect to the <br /> additional requirements of the MCWD and subj ect to the additional requirements and <br /> conditions specif ed by City Engineer Tom Kellogg in his letter dated September 25, <br /> � � 2002. <br /> 3. Approval of"Preliminary Utility Plan" per Sheet G4.1 dated 9/18/02,subject to <br /> the additional requirements specified by City Engineer Tom Kellogg in his letter <br /> dated September 25, 2002. <br /> =�. Approval nf"Preliminary Landscape Plan" per Sheet L2.1 dated 9/17/02, subject <br /> to the following additional conditions: <br /> � <br /> Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.