Laserfiche WebLink
Amberwoods Office Center <br /> Plumbing <br /> Plan No. 086456 <br /> Page 3 <br /> January 29,2008 <br /> 13. The plumbing system shall be tested in accordance with Minnesota Rules,part 4715.2820. All portions of <br /> the storm sewer system located within 10 feet of the building or water service line must be tested in <br /> accordance with Minnesota Rules,part 4715.2820. All storm sewer connections and joints shall be <br /> watertight(Minnesota Rules,part 4715.2820). <br /> 14. All plumbing shall be installed in accordance with the Minnesota Plumbing Code (see Minnesota Rules, <br /> part 4715.0320). <br /> NOTE(S): <br /> 1. The scope of this project consists of 5 new identical buildings. Installation in each building includes two <br /> restrooms finished restrooms in the lower level, four rough-ins for future restrooms, a wall hydrant, a water <br /> heater, and a mop sink. <br /> 2. This facility is served by new municipal water and sewer service connections. All of sanitary sewer and <br /> watermain in Lot No 6 is owned and maintained by the City of Orono as documented by Loucks Associates, <br /> dated January 18, 2008. <br /> Authorization for construction in accordance with the approved plans may be withdrawn if construction is not <br /> undertaken within a period of two years. The fact that the plans have been approved does not necessarily mean <br /> that recommendations or requirements for change will not be made at some later time when changed conditions, <br /> additional information, or advanced knowledge make improvements necessary. <br /> Appro <br /> 1 . Tran,P.E. <br /> Pu.lic Health Engineer <br /> Plumbing Plan Review and Inspections Unit <br /> 443 Lafayette Road North <br /> St. Paul, Minnesota 55155-4343 <br /> 651/284-5898 <br /> CMT:jat <br /> cc: Palo Companies, Inc. <br /> Interspace Companies, Inc. <br /> Mr. Lyle Oman,Building Official <br /> File <br />