Laserfiche WebLink
• <br /> MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY' <br /> Division of Construction Codes and Licensing <br /> REPORT ON PLANS <br /> Plans and specifications on plumbing: Amberwoods Office Center, 2060 West Wayzata Boulevard, Orono, <br /> Hennepin County,Minnesota,Plan No. 086456 <br /> OWNERSHIP: Interspace Companies, Inc.,P.O. Box 184, Wayzata, Minnesota 55391 <br /> SUBMITTER(S): Palo Companies, Inc., 14208 US Highway 12 Southwest, Cokato, Minnesota 55321 <br /> Plans Dated: <br /> Date Received: January 25, 2008,December 31, 2007 <br /> Date Reviewed: January 29, 2008 <br /> SCOPE: This review is limited to the design of this particular project only insofar as the provisions of the <br /> Minnesota Plumbing Code, as amended, apply, and does not cover the water supply or sewerage system to which <br /> this plumbing system is connected. The review is based upon the supposition that the data on which the design is <br /> based are correct, and that necessary legal authority has been obtained to construct the project. The <br /> responsibility for the design of structural features and the efficiency of equipment must be taken by the project <br /> designer. Approval is contingent upon satisfactory disposition of any requirements included in this report. <br /> Special care should be taken to insure that the material and installation of the plumbing system are in accordance <br /> with the provisions of the Minnesota Plumbing Code. A copy of the approved plans and specifications should <br /> be retained at the project location for future reference. <br /> A set of the identified plans and specifications is being returned to Palo Companies, Inc. <br /> INSPECTIONS: All plumbing installations must be tested and inspected in accordance with the requirements of <br /> the Minnesota Plumbing Code. As specified in Minnesota Rules,part 4715.2830,no plumbing work may be <br /> covered prior to completing the required tests and inspections. Provisions must be made for applying an air test <br /> at the time of the roughing-in inspection as outlined in Minnesota Rules,part 4715.2820, subpart 2, of the code. <br /> A manometer test,as specified in Minnesota Rules,part 4715.2820, subpart 3, is required at the time of the <br /> finished plumbing inspection. It is the responsibility of the contractor/installer to notify the Minnesota <br /> Department of Labor and Industry when an installation for a state contract job, licensed facility, or project in an <br /> area where there is no local administrative authority is ready for an inspection and test. To schedule inspections, <br /> contact the state plumbing standards representative for your region, or call Jim Peterson at 651/284-5889. <br /> REQUIREMENT(S): <br /> 1. A full-size vent stack(3-inch minimum)must be provided for every building(see Minnesota Rules, <br /> part 4715.2520, subpart 1). This stack must be continuous in size from its base to its terminal and should be <br /> the most remote stack from the location where the building drain leaves the building. <br /> 2. Installation of fixtures in regards to separation from the walls and fixtures shall be in accordance with <br /> Minnesota Rules,part 4715.1220. No water closets may be set closer than 15 inches from the center to any <br /> side wall Please assure the water closets are installed accordingly. <br /> 3. The cold water line shall be at least 1-inch in size between the restroom 104 up to the wall hydrant. <br /> 4. A water distribution branch serving two tank-type water closets must be at least 3/4-inch in size(see <br /> Minnesota Rules,part 4715.3800). <br /> 5. All external sillcocks and wall hydrants must be provided with separate shut-off valves inside the building <br /> (see Minnesota Rules,part 4715.1800, subpart 7). <br />