My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-00930 - plumbing
Orono
>
Property Files
>
Street Address
>
W
>
Wayzata Boulevard West
>
0875 Wayzata Boulevard West - 35-118-23-44-0011
>
Permits/Inspections
>
2011-00930 - plumbing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:59:56 PM
Creation date
1/6/2020 1:12:36 PM
Metadata
Fields
Template:
x Address Old
House Number
875
Street Name
Wayzata
Street Type
Boulevard
Street Direction
West
Address
875 Wayzata Boulevard West
Document Type
Permits/Inspections
PIN
3511823440011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H <br /> 0 <br /> necrnlnmmnn h Cnnei,1 hi nn <br /> T n <br /> August 10,2011 (Revised August 23,2011) <br /> Lyle Oman <br /> Tom Kellogg,PE <br /> c/o The City of Orono <br /> 2750 Kelley Parkway <br /> Long Lake,MN 55356-9387 <br /> Re: Orono Senior Housing <br /> Gentlemen, <br /> The approved plans for the Orono Senior Housing project include provisions to use directionally <br /> drilled polyethylene pipe (PEP) for the forcemain and watermain within the site. Since these lines <br /> will be privately maintained they fall under the Minnesota Plumbing Code,which does not <br /> specifically list PEP as an approved material. Therefor the Minnesota Department of Labor and <br /> Industry has required us to submit this written request to the City of Orono to specifically allow this <br /> alternative material and installation method. <br /> We propose to install the PEP by Horizontal Directional Drilling in conformance with ASTM <br /> F1962- 11 "Standard Guide for Use of Maxi-Horizontal Directional Drilling for Placement of PE <br /> Pipe or Conduit Under Obstacles,Including River Crossings". The pipe joints will be butt fused in <br /> the field following ASTM F2620—09e1.The pipe material should be dimensioned and <br /> manufactured according to ASTM F 714-05,and meet the requirements of ANSI/AWWA C 906- <br /> 2006 Polyethylene Pipe and Fittings,4 in(100 mm)Through 63 in(1,575 mm) for Water <br /> Distribution. <br /> Please sign below and return a copy of this letter to me indicating that these materials and <br /> installation methods are acceptable. If you have any questions or need any additional information <br /> please give me a call. <br /> Best regards, <br /> Ir <br /> f / <br /> Steve Johnston,PE <br /> cc: Jim Beckwith,Krause Anderson Construction <br /> Matt Alexander,Kraus Anderson Realty <br /> Approved: <br /> By: •Sid <br /> l 0 OAi(1 Qv4L.dfnt O,hCt,k( Date 9 -2' " r2 1 t <br /> J <br /> RHO Development Consulting,Inc. <br /> PO Box 357,Long Lake,MN 553546-357 p/(612)382-4804 f/ (952)476-0876 www.RHOdevelopment.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.