My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Geotechnical Evaluation Report
Orono
>
Property Files
>
Street Address
>
W
>
Wayzata Boulevard West
>
0875 Wayzata Boulevard West - 35-118-23-44-0011
>
Misc
>
Geotechnical Evaluation Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:59:54 PM
Creation date
1/6/2020 10:11:57 AM
Metadata
Fields
Template:
x Address Old
House Number
875
Street Name
Wayzata
Street Type
Boulevard
Street Direction
West
Address
875 Wayzata Boulevard West
Document Type
Misc
PIN
3511823440011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kraus-Anderson Realty Company <br /> Project BL-11-01014 <br /> March 18,2011 <br /> Page 5 <br /> The SPT N-values in the glacial deposits ranged from 2 to 24 BPF, indicating consistencies in the clays <br /> ranging from soft to very stiff and densities in the granular soils ranging from very loose to medium <br /> dense.The moisture content of select samples of glacial soils tested ranged from approximately 19 to 25 <br /> percent. <br /> B.2.e. Groundwater <br /> Groundwater was encountered in 5 of the 7 recent borings at depths ranging from of approximately 12 <br /> to 19 feet below existing grades at the time of this exploration.The elevations of the water encountered <br /> typically varied from approximately 946 to 950 feet MSL. However, based on nearby wetlands, it is our <br /> opinion that long-term groundwater levels at this site would likely approach elevations on the order of <br /> 954 to 956. <br /> Soil conditions are also conducive for perched water to occur at higher elevations across the site and <br /> water features including wetlands are present near this site which could also affect groundwater levels. <br /> In clayey soils,groundwater could take several days to stabilize in the boreholes and our boreholes were <br /> immediately backfilled.Seasonal and annual fluctuations of groundwater should also be anticipated. <br /> Piezometers or monitoring wells would be required to confirm if groundwater was present within the <br /> depths explored. <br /> C. Basis for Recommendations <br /> The proposed construction will include a two-story, residential structure and associated surface parking <br /> lots, drive ways, utilities,and biofiltration basins. <br /> Structural details for the proposed building have not been provided at this time.We understand that the <br /> building will be wood-framed construction supported on conventional spread foundations with a <br /> concrete slab-on-grade. Based upon information provided by the structural engineer, the building will <br /> have maximum individual (column)foundation loads of 30 kips and a maximum continuous(wall) <br /> foundation load of 2 kips per linear foot. If structural loads exceed these values, we should be contacted <br /> to review our recommendations. <br /> We understand a drive-under, entrance canopy will be built on the east side of the main building <br /> entrance. The canopy will have four column supports at its corners. <br /> BRAUN <br /> INTERTEC <br />
The URL can be used to link to this page
Your browser does not support the video tag.