My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Geotechnical Evaluation Report
Orono
>
Property Files
>
Street Address
>
W
>
Wayzata Boulevard West
>
0875 Wayzata Boulevard West - 35-118-23-44-0011
>
Misc
>
Geotechnical Evaluation Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:59:54 PM
Creation date
1/6/2020 10:11:57 AM
Metadata
Fields
Template:
x Address Old
House Number
875
Street Name
Wayzata
Street Type
Boulevard
Street Direction
West
Address
875 Wayzata Boulevard West
Document Type
Misc
PIN
3511823440011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kraus-Anderson Realty Company <br /> Project BL-11-01014 <br /> March 18, 2011 <br /> Page 17 <br /> E.3. Pavement Subgrade Proof-Roll <br /> We recommend that proof-rolling of the pavement subgrades be observed by a geotechnical engineer to <br /> determine if the results of the procedure meet project specifications,or delineate the extent of <br /> additional pavement subgrade preparation work. <br /> E.4. Equipment Support <br /> The recommendations included in the report may not be applicable to equipment used for the <br /> construction and maintenance of this project. Subgrade conditions in areas where it is intended to <br /> support shoring, scaffolding, cranes, pumps, lifts and other construction equipment should be evaluated <br /> prior to mobilization to determine if the exposed materials are suitable for equipment support, or if <br /> some form of subgrade improvement should first be performed. Consideration should be given to the <br /> affect that loads applied by such equipment may have on structures they bear on or surcharge- including <br /> pavements, buried utilities, below-grade walls, etc.We would be pleased to assist you in this evaluation. <br /> F. Procedures <br /> F.1. Borings <br /> The standard penetration test(SPT) borings performed in 2011 were drilled with a core and auger drill rig <br /> equipped with 3 1/4-inch hollow-stem augers.The borings were performed in general accordance with <br /> ASTM D 1586. SPT samples were taken at 2 1/2-foot intervals to a depth of 15 feet,then at 5-foot <br /> intervals to termination.Actual sample intervals and corresponding depths are shown on the Boring Logs <br /> in the Appendix. <br /> F.2. Material Classification and Testing <br /> F.2.a. Visual and Manual Classification <br /> The geologic materials encountered were visually and manually classified in general accordance with <br /> ASTM Test Method D 2488.A chart explaining the classification system is provided in the Appendix. <br /> Samples were sealed in jars and returned to our facility for review and storage. <br /> BRAUN <br /> I NTE BTEC <br />
The URL can be used to link to this page
Your browser does not support the video tag.