Laserfiche WebLink
construction observation performed by the City's in-house engineering staff or consulting engineer. <br /> Construction observation shall include part or full time inspection of proposed public utilities. <br /> 15. STORMWATER MANAGEMENT. Stormwater management for the <br /> Development/RPUD/PUD #7 will be provided by infiltration basins and stormwater ponds. Prior to final <br /> development approval by the Orono City Council, the Developer must provide suitable evidence of <br /> Minnehaha Creek Watershed District approval of the stormwater management plan. <br /> 16. STORM WATER AND DRAINAGE. Prior to final development approval by the Orono <br /> City Council, the Developer must pay the standard storm water and drainage trunk fee for residential <br /> development per the 2011 City Fee Schedule based on the rate for multifamily residential greater than 4 <br /> units per acres calculated as follows: <br /> 10.63 gross acres x $7,000/acre = $74,410.00 <br /> 17. SEWER AND WATER. The Development/RPUD/PUD #7 is within the MUSA. Service <br /> and water service to serve the Development/RPUD/PUD #7 will be from the City of Wayzata via sewer <br /> and water mains that have been extended to the Development/RPUD/PUD #7 boundary. The Developer <br /> is responsible for installing the required sanitary sewer and municipal water connections subject to <br /> approval by the City Engineer. The City will inspect these systems during construction to ensure proper <br /> installation. There are no City sewer and water connection charges due with the <br /> Development/RPUD/PUD #7 because the property has been previously assessed for sewer and water <br /> installation. The Developer shall, however, be responsible for connection charges imposed on the City <br /> or the Developer by the City of Wayzata for connection to its sewer and water mains. Construction and <br /> maintenance of a non-clog sewer lift station to serve the Development/RPUD/PUD #7 is the <br /> responsibility of the Developer. MCES Sewer Availability Charges will be collected with the building <br /> permit for the property. <br /> 18. WETLAND AND WETLAND BUFFER AREAS. The Development/RPUD/PUD #7 <br /> property contains approximately 3.8 acres of wetland containing two wetland basins. The wetland areas <br /> are subject to the standard City Permanent Flowage and Conservation Easement and Restrictive <br /> 7 ORONO/Orono Senior Housing Project <br /> No. 11-3498 (875 Wayzata Boulevard) <br />