Laserfiche WebLink
Page / of <br /> B R A U N ,,„,_(if„aII- <br /> I NTE RTEC Daily Field Notes <br /> Project No.: A-``/ — 4 '/O 1 <4"/ Date:Date: // 7—/7 Report No.: (� <br /> Project Name: A' o ri-p ,--_-5;f7--,''o / �S '� Project Location: /41‘.---, L.¢�c..- L, T <br /> Client: s-c.-S— _ .. S o-• Temp/Weather: ,�� / .. .-. <br /> Project Manager: (.-z—s,/ - -,-r4_ - Time Arrived: / Departed: <br /> Services Performed <br /> ❑ Compaction Testing ( Concrete Testing ❑ Cylinder Pickup ❑ Proctor Pickup ❑ Masonry Pickup <br /> ❑ DCP ❑ Other(describe) <br /> Density Testing <br /> Areas Tested: ❑ Mass Grading ❑ Building Pad O Wall Backfill O Slab Subgrade O Parking/Walks <br /> O Utilities ❑ Roadways ❑ Bituminous ❑ Other(describe) <br /> Method: ❑ Nuclear ❑ SandconI #of tests: I Fill Source: ❑ On-site O Imported <br /> Tests taken met specification? ❑ Yes O No O Waiting on Proctor results? <br /> Contractor notified of test results? ■ Yes O No Name of person notified: <br /> Concrete Testing Information <br /> Areas Tested: O Footing ❑ Slab on Grade ❑ Deck O Columns/Piers O Walls <br /> 7 Pile Cap/Pile Fill ❑ Pavement CCurb&Gutter ❑ Other(describe) <br /> No. of placements: / Yards per placement: Method of placement: <br /> Set # Cylin, er Size Air% Slump Temp Mix Supplier Spec. Strength Workorder# <br /> Contractor notified of test results? fe Yes O No, Name of person notified: <br /> Overall Remarks/Comments (Explain any concerns,problems or unusual occurrences) <br /> Was everything available to test/observe? ■ Yes O NoWere there any delays? (Explain below if yes) ❑ Yes ,(4,No <br /> Was a copy of this report left on site? l'../ Yes ArNo If so,whom was it submitted to: f,.,Y1-� .. <br /> s — _ <br /> � <br /> Comments: ei je.”-ve , G%6'KF`-,e.....4_, /4"zti v -r— 4..c.y., <br /> c21:111G*- pl y e 4 fir s.?Q'k_ r /4)es/ s.Wes ®I'C-e sc1c <br /> 4' r1 ,ay., /7 m.C- ,5 *' 7L 7`'5 f.t-- l-rt. �-�- <br /> /''' 7-,,.gr'G- 5 ,e,..,,/.. lc tet.-.�s� .,..---,...,4--...,,,‘,;.-- €_,..._34,',(' ,. <br /> .„,e ---, <br /> 7 rformed By: /./ ...----2..........-4 Reviewed by: �-J Date: a <br /> This is a preliminary re rt and is provided solely as evidence that field observations and/or testing was performed. Observations and/or conclusions <br /> and/or recommend ons conveyed in the final report may vary from,and shall take precedence,over those indicated in a preliminary report. <br /> • Providing engineering and environmental solutions since 1957 <br />