Laserfiche WebLink
Page of I <br /> • <br /> DFNTS Rev 11 to8 <br /> BRAUN <br /> 'TE RTEC Daily Field Notes <br /> Project No.: g t, 11 A- Report No.: <br /> Project Name: 0 Cy'� rl t� - ( ��`lC1 Date: q (71-3 /if <br /> � <br /> Project Manager: ,g - ! c.Covr Y- / p/W e .Tem eath r• fr'L 6.0 S <br /> Personnel Classification Regular Hours Overtime Hours <br /> c\-(AAi. c-h iv <br /> Areas and work performed this day: t� c'rl )t"RA, it)ar 44,k. (f <br /> fl-p&eit s ? 441 CAkiC , � s 14-e ,pcor. <br /> "(sir"( a ; s/ O, <br /> 4e (As 4- I '.' . eS pr, -eco` <br /> Performed By: <br /> lifted To: ' L A <br /> This is a preliminary report and is provided solely as evidence that field observations and/or testing was performed. Observations and/or conclusions <br /> and/or recommendations conveyed in the final report may vary from,and shall take precedence over,those indicated in a preliminary report. <br /> • Providing engineering and environmental solutions since 1957 <br />