Laserfiche WebLink
1 •,i <br /> f5 Lt <br /> I, c� Braun Intertec Corporation Fr',one 952 x/95-2050 <br /> � Fa <br /> ,(j 1 Hampshle Avenue S Fox 952 2 2020 <br /> Mi�meaar,lu MN 55438 Woo 1) inintert.ccox <br /> March 13, 2012 Project BL-11-01014A <br /> 1 s' ; <br /> r <br /> Mr.Jim Beckwith <br /> a' Kraus-Anderson Construction Company <br /> 525 South 8th Street <br /> Minneapolis, MN 55404-1077 <br /> Re: Non-Structural Steel Special Inspection Procedural and Final Report Submittal <br /> } } , Orono Senior Housing Facility <br /> 875 Wayzata Boulevard <br /> ' 4'% Orono, Minnesota <br /> Dear Mr. Beckwith: <br /> Please find attached to this procedural report the Non-Structural Steel Special Inspection Final Report for <br /> the above referenced project and supporting Special Inspection Daily Reports for your review and <br /> records. <br /> Special Inspection and Testing Procedures <br /> The special inspection services were provided by International Code Council (ICC) certified special <br /> 4 " inspectors in accordance with the requirements of Chapter 17 of the International Building Code (IBC), <br /> the Special Inspection and Testing Schedule and/or the project plans and specifications. <br /> The purpose of special inspections is to provide a review of the contractor's work designated by the <br /> • <br /> `• project structural engineer as needing special inspection under the guidelines of the IBC to determine <br /> compliance with the approved construction documents.The special inspector doesn't have the <br /> responsibility or authority to, nor is it the intent of special inspections to have them,judge, or modify the <br /> construction documents. Only the structural engineer of record can do this. <br /> As the special inspections were completed, a Special Inspection Daily Report was prepared to summarize <br /> the results of our inspections and testing. A copy of this report was provided to the contractor's site <br /> representative for their review and records. As part of this report, items needing correction or <br /> discrepancies observed from the approved construction documents were noted. <br /> Plans and Specifications <br /> The provided plans and specifications or the plans available at the site were used for our inspections. <br /> Summary of Special Inspections and Material Observations and Tests <br /> Soil Evaluation and Testing <br /> Braun Intertec Completed a Geotechnical Evaluation Report for this project on March 18, 2011 under the <br /> project number BL-11-01014.The borings performed encountered a variety of geologic materials including <br /> Providing engineering andenvironmental solutions since 1957 <br />