MINUTES OF THE <br />ORONO PARK COMMISSION <br />Monday, May 6, 2019 <br />6:30 o'clock p.m. <br />STAFF REPORTS <br />2. PUBLIC WORKS PARKS UPDATE <br />Edwards reported on the following activities of the Public Works Department: <br />• Port -a -Pots and garbage cans have been placed at all parks. <br />• Spring inspections have begun of all parks and are nearly completed. <br />• One additional round of snow and ice removal was done on the trails. No major trail projects are <br />planned for this year. <br />• The golf course is now open for the season. Since opening, some irrigation repairs have been <br />done, a new water softener was installed, and some flushing of the drain system was performed. <br />• The City Council did award the drainage cart path project for the golf course. <br />• A baby swing was installed at Antoine Park. <br />• Big Island Park was inspected. Some dock repairs need to be performed and a dock modification <br />to get the docks in and out easier. <br />• Biweekly maintenance work will be commencing next week at the parks. <br />• Gravel for the parking lot at French Creek was installed. <br />• Tree removal was performed at Saga Hill. <br />• The ice rink was removed at Crystal Bay and removal of the existing split rail fence is scheduled <br />due to its deteriorating condition. <br />• Closed the winter access points and opened the summer access points around Orono. Performed <br />dock repairs at the Loma Linda access due to damage caused from a snowmobiler. An insurance <br />claim has been submitted. <br />• The sunshades were installed at Lurton Park and some fence repairs are scheduled. Prairie <br />Restoration performed its 5 -year burn of the prairie. Last year they performed a close mow, <br />which does not work as well as the burn, but does not cause a lot of soot. <br />• Tree removal was performed at French Creek. <br />Edwards indicated he did meet with the Girl Scout who is interested in completing the memorial garden <br />project at Lurton Park. Work on that project is expected to start in the near future. A meeting was also <br />held with the Boy Scout who will be constructing a screen around the port -a -pot and some trail work. <br />Johnson asked when the projects are anticipated to be complete. <br />Edwards stated he expects the Girl Scout project to be completed by early summer and that he is not sure <br />when the Boy Scout will be commencing his work. <br />The surveying for the Bederwood sports field project has been completed and a design is underway. The <br />draft design is expected to be completed in the next week and a half. <br />The grant applications for the Big Island project and East Long Lake Road will be submitted to the DNR <br />and grant awards are expected by the end of June/early July. <br />The City Council approved the cooperative agreement for the Dakota Trail connection. Three Rivers <br />Park District is the lead designer on that and they hope to have 60 percent of the design to all the partners <br />by the end of July. Each of the three partners (Hennepin County, the City of Orono, and Three Rivers) <br />Page 2 of 7 <br />