<br /> GUIDE TO ASSIST YOU WITH YOUR
<br /> E—Z FRAME SHEDQROW
<br /> s...A., .. ,. , ., . .
<br /> 10' x 10' • 10' x 12' • 10' x 14' • 10' x 16'
<br /> COPYRIGHT BY MENARDS, INC. SEP 1999
<br /> 1. GENERAL www.midwestmanufacturing.com
<br /> Prior to beginning construction, the area `"
<br /> selected for the shed location must be level - .
<br /> and cleared of obstructions.
<br /> 2. INVENTORY
<br /> Separate all lumber, hardware, etc. into indi- 3
<br /> vidual stacks of like items. {
<br /> 3. FRAME PREPARATION
<br /> Unfold each frame, setting aside two frames to " Lumber
<br /> be used as end walls. From 1" x 4" pine ,t listed as
<br /> boards, cut gusset plates 6" long;
<br /> '"','::::--,1‘';,..,;‘,7",,°~u �� NOMINAL
<br /> 020 for a 10' building :.R-'_:.7,,,,,, ,014,%:,,O,,d, „ r
<br /> SIZES
<br /> •24 for a 12' building �x��.�tt� . ..<� r. k�,.., M
<br /> 028 for a 14' building
<br /> .32 for a 16' building Figure 1.
<br /> Apply gusset plates on each side of the top and 6g,1/4" �`
<br /> bottom fold locations. Frames to be used as
<br /> end walls require only one gusset plate at top 1"x4"x6"gusset
<br /> and bottom on the side opposite the metal plate at top "�
<br /> plates. Use four 8d nails on each gusset plate. 1 2'x4" ftilifen
<br /> OR NO
<br /> See Figure 1. 16" Roof Frame OF BUILDING P RMIT LAN
<br /> R&N,IEW
<br /> 4. BACK WALL FRAME Member
<br /> INSPECTOR
<br /> DATE S'-1-°Ca r:In- •:o,
<br /> Using one frame selected as an end wall, mea-
<br /> 2"x4" APPROVED , „i �,�,, , 79"
<br /> sure and mark stud locations according to 2"x4"
<br /> dimensions shown in Figure 2. Place the prop Side Wall Frame G i 0
<br /> er length 2" x 4" stud at those locations. Mark Member C Sa1/2�
<br /> ' ' :
<br /> required length and angles. Cut each 2"x 4" to Treated 2"x4" 1'x4"x6 gus t •
<br /> fit. Toe nail studs into place using (2) 8d nails Bottom Frame plate at bottom:fold _ }i .j. ;1, `- •:-,v.
<br /> top and bottom. See Figure 2. Member :4,46E6/0 r'Ll` N ON &.l...A i _S
<br /> 44411PILI You may need more or less - �,ri -1-1/2" -0.,1 E
<br /> � materials depending on how
<br /> << 10'-0" J. I 1-1/2"
<br /> you build.If you need more
<br /> we'll sell you more,if you' iliiiibliP Figure 2.
<br /> have left overs, bring —�
<br /> Toe nail studs
<br /> it back!\ '.4t, dr * ililIllili into place(TYP)
<br /> ‘I\ ) fir
<br /> www.midwestmanufacturing.com
<br /> PLEASE NOTE: This shed construction aid is intended solely 2"x4"x8' 0"
<br /> to provide general knowledge as to one of the ways a shed may end wall studs
<br /> III
<br /> be constructed using matenals available from MENARDS. We
<br /> suggest you check with your local building officials regarding cut to fit.
<br /> site location, permit procedures, safety regulations and specif 20 20 1 18-
<br /> cations of materials used to construct your new storage shed. 1/2I 1/2 3/4
<br /> Builders who utilize this aid must proceed at their own risk and
<br /> are solely responsible for complym with all building codes
<br /> which pertain in their community.MENARDS hereby disclaims 1-1/2" 01
<br /> all liability for any damages whether consequential, incidental,
<br /> special or otherwise, which may result from following this do- 10'-0"
<br /> it-yourself aid.