Laserfiche WebLink
• <br /> 7. HOW TO GET TO THE SITE Attach a simple site locator map. If needed, include on the map written directions to the site <br /> from a known location or landmark. Include highway and street names and numbers.Also provide distances from known <br /> locations and any other information that would assist in locating the site. Label the sheet SITE LOCATOR MAP. <br /> 8. PURPOSE OF PROJECT: What do you propose to do,and why is it needed?Please be brief. (See HELP 8 <br /> before <br /> completing this section.) ti, a y t 2 re d- 1474/ A4 E: ,be.er Tj/7ec/' <br /> ih by Seri"hesi7'- 71);.s. cud/ harp <br /> i/9 L11'1'1i/5 UGi a gtl/Gh 7p' f 4/ re4i)rh ' <br /> 9. PROPOSED TIMELINE:Approximate project start date: 31br)h, 'e'/ Projected end date: FY ft' —0/ <br /> 10. PROJECT DESCRIPTION: Describe in detail what you plan to do and how you plan to do it. This is the most important <br /> part of your application.See HELP 10 before completing this section;see also What To Include on Plans(Instructions, <br /> page 2). If space below is not adequate, attach separate sheet labeled PROJECT DESCRIPTION. <br /> 7 a f4,4ga.4/'G 2 ip Q ,ch y r 11i//a/ h+« f* <br /> ifrOkiL 749 hi- done rA.i/'A rn 7r"441e a XLHawfo' othd m4i+l2. '"/ <br /> y sA d 45" o�-y��:c *S'` 7(}"� LJ `r-f r 9 of tee// y 5 ;17f-�r <br /> ipt r g df- 19412/6, isyP7 f3r�h, 393 �se <br /> 4Gwr14./4/1ifc- . rr.e i / r e,/,es of. pthd$ f.y.'X' a//c- k, 4I--r41��C�, <br /> S� <br /> /4- -pi...;h) ri>41.1 <br /> 11. FOOTPRINT OF IMPACT(if applicable): Indicate total amount(in acres or square feet)of wetland(s)or water body <br /> area(s)to be filled, drained, inundated or excavated;and/or indicate length of stream or river affected(in linear feet). <br /> /i ( <br /> c acres or� �000 square feet and/or linear feet <br /> 12.TYPE AND ESTIMATED AMOUNT OF MATERIALIS)TO BE PLACED INTO OR EXCAVATED FROM THE WETLAND <br /> OR WATER BODY (if applicable): List each type of material(such as rock, sand,clay,concrete)to be filled or excavated, <br /> and estimate amount in cubic yards. <br /> ❑ FILLING EXCAVATING <br /> Type(s)of material Estimated amount in cubic yards Type(s) of material Estimated amount in cubic yards <br /> tri 1r 2e4,0 <br /> • <br /> 13. ESTIMATED PROJECT COST: �ae (for determination ofDNR fees only, which are based on total project cost) <br /> 2 <br />