Laserfiche WebLink
INSTRUCTIONS <br /> Instructions for Part 1 Instructions page , <br /> } What To Include on Plans .Instructions page 2 <br /> Final Checklists Instructions pages 2-3 <br /> .Preparing Your Application for MailingInstructions page 3 <br /> ° <br /> Mailing Your Application: Instructions page 4 <br /> Instructions for Part 1 <br /> HELP 1: Every applicant needs to fill out Section 1 with the name of the responsible party. If the responsible party is <br /> an agency,company,corporation or other organization, indicate the responsible officer and title in the Name line. If more <br /> than one party is associated with the application,attach a separate sheet labeled APPLICANT CONTACT INFORMATION. <br /> HELP 1k Fill out Section 1A only if you have designated an authorized agent.An authorized agent is an individual or <br /> agency,designated by you,to represent you in this process.An agent can be an attorney,builder,consultant,contractor, <br /> engineer, or any other person or organization.An agent is not required. <br /> HELP 8: Purpose of project:Indicate briefly(in a sentence or two)what you propose to do and why it is needed. Include, <br /> if appropriate,a brief description of any related activities or benefits occurring as a result of the proposed project. <br /> HELP 10: Describe in detail what you plan to do and how you plan to do it.Include in your written description any <br /> of the following elements that apply to your project. Do not write on this instruction sheet.Instead, include in your written <br /> description a discussion of applicable components below: <br /> ■Whether your project will include such activities as construction, filling,draining,dewatering,removing, <br /> excavating or repair. <br /> ■Whether you will be constructing something, such as an access path,bridge,culvert, dam,ditch,dock, driveway, <br /> riprap,road, sandblanket or tile line. <br /> ■The proposed dimensions of any structures,such as wingwalls or dikes,as well as what the structures would be <br /> made of and what method(s)would be used to do the work. <br /> ■Whether you will be constructing any structures on fill,piles or a float-supported platform.If so,describe. <br /> ■Whether you will be dredging or discharging(placing fill material)into a wetland or other water body(including <br /> the temporary placement of material). If so, explain the specific purpose of the placement of the material (such as <br /> erosion control)and indicate how it will be done(such as with a backhoe or dragline). If dredged material is to be <br /> discharged on an upland site, identify the site,and indicate the steps that will be taken(if necessary)to prevent runoff <br /> from the dredged material back into the wetland or water body. Describe the characteristics of the soil you are <br /> discharging,dredging or excavating. <br /> ■Your description must also include a detailed overhead view that clearly depicts the work to be undertaken. <br /> See What To Include on Plans(Instructions,page 2). <br /> HELP 15: If any part of the work has already been completed,describe the area already developed. Include <br /> a description of structures completed; any dredged or fill material already discharged(including type of material <br /> and volume in cubic yards);acres or square feet filled(if a wetland or other water body); and whether the work <br /> was done under an existing permit(if so,identify the authorization,if possible). <br /> HELP 16:For information regarding adjacent landowners, contact the city or county tax assessor where the project <br /> is to be developed. <br /> HELP 17:Other permits, reviews or approvals related to the project may include the following: conditional use permit; <br /> plat approval; zoning variance;National Pollutant Discharge Elimination System permit; state disposal system permit <br /> (includes dredged material disposal); watershed district/watershed management organization permit(stonnwater, erosion, <br /> floodplain); environmental assessment worksheet/environmental impact statement;hazardous waste site; feedlot permit; <br /> groundwater appropriation permit; or county/township driveway/road permit. <br /> Instructions 1 <br />