Laserfiche WebLink
20. SPECIAL CONSIDERATIONS:Are you aware of any special considerations that apply to either the impact site(s) <br /> or the replacement site(s)? (Examples: the presence of endangered species, special fish and wildlife resources, <br /> sensitive surface waters, or waste disposal sites)If YES, list and describe briefly. <br /> 21. ARCHAEOLOGICAL OR CULTURAL RESOURCE DETERMINATIONS: Are you aware of any archaeological <br /> or cultural resource determinations or surveys completed concerning the project or replacement site by the State Historical <br /> Preservation Office (SHPO)or others? If yes, please explain below or attach a copy of any determinations <br /> or surveys. <br /> 22. HOW PROPOSED REPLACEMENT WILL BE ACCOMPLISHED: Indicate how proposed replacement will be <br /> accomplished(check only one box below and continue as indicated): <br /> ❑A. Wetland banking only <br /> •Complete Application for Withdrawal of Wetland Credits Form and include with your application. <br /> Copies of this form are available from your LGU, or download a copy from www.bwsr.state.mn.us <br /> • Skip to Section 27,page 8. (You do not need to complete Sections 23-26.) <br /> ❑ B. Project-specific replacement only <br /> •Continue with Section 23 below. <br /> ❑C.A combination of wetland banking and project-specific replacement <br /> •Complete Application for Withdrawal of Wetland Credits Form and include with your application. <br /> Copies are available from your LGU,or download a copy from www.bwsr.state.mn.us <br /> •Continue with Section 23 below. <br /> 23. DESCRIPTION OF REPLACEMENT WETLAND(S) CONSTRUCTION (Complete this section only if you marked Box B <br /> or Box C in Section 22 above):Describe in detail how replacement wetland(s)will be constructed.If several methods <br /> will be used, describe each method. Details should include the following: 1)type of construction(such as excavated <br /> in upland,restored by tile break,restored by ditch block or revegetated); 2)type, size and specifications of outlet <br /> structures;3)elevations relative to Mean Sea Level or established benchmarks of key features(such as sill,emergency over- <br /> flow or structure height);4)what best management practices will be implemented to prevent erosion or site degradation; <br /> 5)proposed timetable for starting and ending the project; and 6)a vegetation management plan.Write this description <br /> on a separate sheet of paper labeled DESCRIPTION OF REPLACEMENT WETLAND CONSTRUCTION. <br /> 24. SURPLUS WETLAND CREDITS: If using project-specific replacement(Box B or Box C in Section 22 above),will the <br /> replacement result in any surplus wetland credits that you wish to have deposited in the State Wetland Bank for future <br /> use?(indicate YES or NO) If yes,submit a Wetland Banking Application directly to your LGU. Copies are <br /> available from your LGU,or download a copy from www.bwsr.state.mn.us <br /> 6 <br />