My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Report on Plans - MDH
Orono
>
Property Files
>
Street Address
>
W
>
Wayzata Boulevard West
>
0200 Wayzata Boulevard West - 36-118-23-43-0001
>
Misc
>
Report on Plans - MDH
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:05:26 PM
Creation date
12/31/2019 11:12:51 AM
Metadata
Fields
Template:
x Address Old
House Number
200
Street Name
Wayzata
Street Type
Boulevard
Street Direction
West
Address
200 Wayzata Boulevard West
Document Type
Misc
PIN
3611823430001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wayzata Country Club Addition/Renovation <br /> Plumbing <br /> Plan No. 050709 <br /> Page 2 <br /> November 3, 2004 <br /> 4. The roof drains must discharge to an approved place of disposal. In no case shall water from the roofs be <br /> allowed to flow upon the public sidewalk. <br /> 5. PVC plastic pipe used for the drain,waste,and vent system shall comply with ASTM Standard D 2665, <br /> D 2949 or F 891 (see Minnesota Rules,part 4715.0570 through part 4715.0600). Solvent weld joints in PVC <br /> and CPVC pipe must include use of a primer which is of contrasting color to the pipe and cement(see <br /> Minnesota Rules,part 4715.0810,subpart 2). <br /> 6. The PVC plastic pipe material to be used for the building sewer must meet one of the following <br /> ASTM Standards: D3034,F789,D2665,or F891. The installation must comply with ASTM <br /> Standard D2321 (see Minnesota Rules,part 4715.0530). <br /> 7. The plumbing system shall be tested in accordance with Minnesota Rules,part 4715.2820. <br /> 8. This plan review is for the plumbing systems only and does not pertain to the licensing requirements for the <br /> facility. The licensing authority will report separately on any licensing requirements which must be met. <br /> Additional plans,information and fee may be required by the licensing authority for their review. Please <br /> note that changes to the plumbing system may be required as a result of their review. Revised plumbing <br /> plans must be submitted showing any significant changes to the plumbing system. <br /> NOTE(S): <br /> 1. The scope of this project consists of the addition onto an existing building. The plumbing installation <br /> includes water closets,urinals, lavatories, showers,electric water coolers,a three-compartment sink,a <br /> grease interceptor,a vegetable prep sink, a dishwasher,disposer sinks,work counters with sinks,hand sinks, <br /> beverage counters,a blender station,trench drains,floor sinks,floor drains,wall hydrants,janitors sinks, <br /> one-compartment counter sinks,clothes washers,a laundry tub,elevator drain sumps,and roof drains. <br /> 2. This facility will be served by an existing municipal water service and a new municipal sewer service. <br /> Authorization for construction in accordance with the approved plans may be withdrawn if construction is not <br /> undertaken within a period of two years. The fact that the plans have been approved does not necessarily mean <br /> that recommendations or requirements for change will not be made at some later time when changed conditions, <br /> additional information, or advanced knowledge make improvements necessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.