My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Correspondence from MillerDunwiddie
Orono
>
Property Files
>
Street Address
>
W
>
Wayzata Boulevard West
>
0200 Wayzata Boulevard West - 36-118-23-43-0001
>
Correspondence
>
Correspondence from MillerDunwiddie
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:05:13 PM
Creation date
12/31/2019 10:43:50 AM
Metadata
Fields
Template:
x Address Old
House Number
200
Street Name
Wayzata
Street Type
Boulevard
Street Direction
West
Address
200 Wayzata Boulevard West
Document Type
Correspondence
PIN
3611823430001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> February 23, 2004 -2 - MEETING MINUTES <br /> Purpose. <br /> The purpose of this meeting was to update the <br /> City of Orono as to the scope and progress of the <br /> Wayzata Country Club proposed project. It was <br /> 1.0 noted that the design team is completing the <br /> Schematic Design Phase and that a contractor <br /> had been pre-selected by the Owner (McGough <br /> Construction.) <br /> Schedule. <br /> MDA noted that the Schematic Design is to be <br /> completed in 2 weeks and estimated by <br /> 1.1 McGough. We anticipate completion of Design <br /> Development in early April 04, with construction to <br /> begin in June/July 2004 and complete April 2005. <br /> Plan walk-through. City of Orono <br /> Tammy Black presented the floor plans of the <br /> proposed project, noting that they are works in <br /> progress, but expressive of the scope and intent <br /> of the project. Included in the floor plans was a <br /> code/exiting plan of the 4 levels. There was <br /> 1.2 discussion about required exiting of the upper <br /> level administrative office area. Lyle indicated that <br /> a corridor through the mechanical space may be <br /> required. It was noted that it may only require one <br /> exit, but the City of Orono was to review this area <br /> further and advise the design team. <br /> Approval Process. Team <br /> MDA inquired about the approval required for this <br /> project. Janice Gundlach noted that a Conditional <br /> Use Permit/Amendment would be required and <br /> that this requires City Council action. The project <br /> is in a zoned Residential Area and is a <br /> Commercial use. She noted that the following <br /> needs to occur: <br /> • The City needs a survey, plans and <br /> elevations of the intended project from <br /> 1.3 MDA. <br /> Janice noted the process would require Planning <br /> Commission review (one month) and City Council <br /> action (2 months.) The following dates were <br /> provided for such action: <br /> April Planning Commission review (March 17 <br /> submittal) provides a May 10 City Council <br /> review/approval date, with a permit issued shortly <br /> thereafter. <br /> MDA noted that the required information was <br /> ready for submittal and review. <br /> C:\Documents and Settings\Ioman.000\Local Settings\TEMP\WCC Code Review notes 021904.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.