Laserfiche WebLink
Wayzata Country Club Addition/Renovation <br /> Plumbing <br /> Plan No. 050709 <br /> Page 2 <br /> November 3, 2004 <br /> 4. The roof drains must discharge to an approved place of disposal. In no case shall water from the roofs be <br /> allowed to flow upon the public sidewalk. <br /> 5. PVC plastic pipe used for the drain,waste,and vent system shall comply with ASTM Standard D 2665, <br /> D 2949 or F 891 (see Minnesota Rules,part 4715.0570 through part 4715.0600). Solvent weld joints in PVC <br /> and CPVC pipe must include use of a primer which is of contrasting color to the pipe and cement(see <br /> Minnesota Rules,part 4715.0810, subpart 2). <br /> 6. The PVC plastic pipe material to be used for the building sewer must meet one of the following <br /> ASTM Standards: D3034,F789,D2665, or F891. The installation must comply with ASTM <br /> Standard D2321 (see Minnesota Rules,part 4715.0530). <br /> 7. The plumbing system shall be tested in accordance with Minnesota Rules,part 4715.2820. <br /> 8. This plan review is for the plumbing systems only and does not pertain to the licensing requirements for the <br /> facility. The licensing authority will report separately on any licensing requirements which must be met. <br /> Additional plans, information and fee may be required by the licensing authority for their review. Please <br /> note that changes to the plumbing system may be required as a result of their review. Revised plumbing <br /> plans must be submitted showing any significant changes to the plumbing system. <br /> NOTE(S): <br /> 1. The scope of this project consists of the addition onto an existing building. The plumbing installation <br /> includes water closets,urinals,lavatories, showers, electric water coolers,a three-compartment sink,a <br /> grease interceptor, a vegetable prep sink,a dishwasher,disposer sinks,work counters with sinks,hand sinks, <br /> beverage counters,a blender station,trench drains,floor sinks,floor drains, wall hydrants,janitors sinks, <br /> one-compartment counter sinks,clothes washers,a laundry tub,elevator drain sumps,and roof drains. <br /> 2. This facility will be served by an existing municipal water service and a new municipal sewer service. <br /> Authorization for construction in accordance with the approved plans may be withdrawn if construction is not <br /> undertaken within a period of two years. The fact that the plans have been approved does not necessarily mean <br /> that recommendations or requirements for change will not be made at some later time when changed conditions, <br /> additional information, or advanced knowledge make improvements necessary. • <br />