My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-00218 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
W
>
Wayzata Boulevard West
>
0200 Wayzata Boulevard West - 36-118-23-43-0001
>
Permits/Inspections
>
2011-00218 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:05:10 PM
Creation date
12/30/2019 1:29:02 PM
Metadata
Fields
Template:
x Address Old
House Number
200
Street Name
Wayzata
Street Type
Boulevard
Street Direction
West
Address
200 Wayzata Boulevard West
Document Type
Permits/Inspections
PIN
3611823430001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
terra <br /> 1801)‘(ii• <br /> • <br /> _Am o general contractors <br /> 21025 Commerce Blvd, Suite 1000 Rogers, Minnesota 55374 ph.763.463.0220 fax.763.463.0290 www.terragc.com <br /> April 1, 2011 <br /> Mr. Lyle Oman <br /> City of Orono <br /> 2750 Kelley Parkway <br /> Orono, MN 55356 <br /> RE: Wayzata Country Club Oasis <br /> Women's Restroom Remodel <br /> Dear Mr. Oman <br /> Please find attached the permit application for the remodel at the Women's Restroom at the <br /> Wayzata Country Club Oasis. I have also attached the drawing showing the scope of the work. <br /> The project includes excavation of the area around the entrance to the women's restroom to <br /> make the access more accessible and we will also be installing a 3'-0" new door into the <br /> restroom as well. The addition of one (1) more water closet will add capacity to the facility and <br /> this will be connected to the existing cleanout at the men's restroom entrance. We are <br /> assuming that this will not be needed to be submitted to the State of Minnesota Plumbing for <br /> permitting and that all permitting will be through the City of Orono. <br /> The estimated cost of the project is $15,000; however, the majority of cost (60%) is the entrance <br /> modifications related to making the restroom more accessible. These costs are as follows: <br /> • Excavation, removal of retaining wall and existing door $4,955.00 <br /> • New door and frame $ 900.00 <br /> • Infill masonry, new door opening and new walkway $1,500.00 <br /> • Terra supervision and misc materials $1,500.00 <br /> $8,855.00 <br /> We are available to meet at any time to discuss any outstanding questions that you may have. <br /> Please contact me at (612) 384-5522 or email at tbrownterraqc.com. <br /> Sincerely <br /> yl'�.l I ().i <br /> ti <br /> Tom H. Brown <br /> President <br /> THB/tb <br /> enclosure <br /> C: file <br /> Chris Gerardi,WCC <br />
The URL can be used to link to this page
Your browser does not support the video tag.