Laserfiche WebLink
02014 Westwood Professional Services. Inc. <br /> t Coll 48 Hours before digging: ". <br /> • 811 or cdl811.com <br /> Common Ground Alliance °AT <br /> ,, Grading Legend <br /> — i <br /> MEM PROPOSED <br /> Westwood <br /> II 4*�aewrmms ——— mm PROPERTY UNE <br /> oro- — ,..1 PLYMOUTH <br /> .__-___ __ _ _ _ LOT LINE Westwood Prohatlaal Senkes,Inc <br /> ffi ( t�`7 I } 1 ---880_ X98 970112th Street North,Suife 206 <br /> L o2 INDEX CONTOUR BL CbW,MN 58303 <br /> ,+"'m; i} L e. <br /> _______799680____ <br /> —S8 — �987�—+ INTERVAL CONTOUR <br /> r ,.. ! r_ ° i PHONE 320-253-0495 <br /> FAS/� r f k CURB AND GUTTER rIXLFRI� 1-eoosx�0-s49s <br /> s' 737 <br /> • If 4$ I POND NORMAL WATER LEVEL <br /> �_ s _ <br /> SILT FENCE w^wwestwoodPamn <br /> 11� U r '. _. f-j STORM SEWER <br /> H <br /> p I <br /> , t. .. t,- - FLARED END SECTION(WITH PoPRAP) <br /> T?s (''rr, _. WATER MAIN a <br /> 'I c" i ` m`e' <br /> � <br /> t" ► SANITARY SEWER ChecChecked YIP <br /> aA <br /> � Dedped: R <br /> t <br /> - <br /> t RETAINING WALL <br /> y: 0 G ` —►►P— DRAIN TILE Read Drew*by/drewc <br /> 'inch Man rem tih,- 1 a— — — —41 BREAK LINE <br /> U,4athpw •>sy.. 0 GRADING LIMITS <br /> !;� <br /> $ ROOK CONSTRUCTION ENTRANCE <br /> / r'+c- - t _ /i'% EROSION CONTROL BLANKET Revtdase <br /> '`:1.-� el , -.,` ^Mips O ' Wayzata w is%iti% TURF REINFORCEMENT MAT <br /> ''•,c,. x677.e0 <br /> r �{ •ru- ` �. • <br /> SPOT ELEVATION • <br /> , hp-UT ' 1 FLOW DIRECTION <br /> 14 DiiN r - r y , 4 a g,,- s.• ,,SQL <br /> /AesnE V 'spa Kw ♦7�' TOP AND BOTTOM OF RETAINING WALL <br /> 0 <br /> R E.O.F. EMERGENCY OVERFLOW <br /> 8 00 <br /> Vicinity Map C s=-'e 43 5e-19 SOIL BORING LOCATION <br /> INLET PROTECTION <br /> Grading Notes ,awi,-a,OM Ili pe we,.ri by we or*., <br /> Mem me 11141=1,1++r Um.esves�NAG <br /> S NQiR=dw r Ism at r Y st MdwY <br /> 1. LOCATIONS AND ELEVATIONS OF EWSTING TOPOGRAPHY AND UTILITIES AS 74/Z44-- <br /> SHOWN ON THIS PLAN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY RobertSITE CONDITIONS AND UTIUTY LOCATIONS PRIOR TO <br /> EXCAVATION/CONSTRUCTION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY p� 11/f1/20I4 Limn No 45023 <br /> J. <br /> Basin parameters IF ANY DISCREPANCIES ARE FOUND. <br /> 2. ALL EXCAVATION SHALL BE IN ACCORDANCE WITH THE CURRENT EDITION OF <br /> West Basin 'STANDARD SPECIFICATIONS FOR TRENCH EXCAVATION AND <br /> Top Basin Elevation 488.03 Minimum Area:1,714 sf BACKFILL/SURFACE RESTORATION'AS PREPARED BY THE CITY ENGINEERS <br /> Bottom Basin Elevation-98675 Minimum Ana:979 sf <br /> ASSOCIATION OF MINNESOTA. <br /> Minimum Side Slopes:4:1 3. ALL DISTURBED UNPAVED AREAS ARE TO RECEIVE FOUR INCHES OF TOPSOIL <br /> Minimum Volume:1,638 cf AND SOO OR SEED. THESE AREAS SHALL BE WATERED UNTIL A HEALTHY <br /> Ccnstru tion Sequence TURF STAND <br /> ESTABUGRASS <br /> IS OBTAINED. SEE LANDSCAPE PLAN FOR PLANTING AND <br /> DM Win <br /> 4. ALL SLOPES SHALL BE GRADED 70 4:1 OR FLATTER, UNLESS OTHERWISE <br /> 1. INSTALL SILT FENCE ON DOWNSTREAM SIDE OF PROPOSED INFILTRATION Top Basin Elevation-986.00 Minimum Area:1,267sf INDICATED ON THIS SHEET. <br /> BASINS. Bottom Basin Elevaton-984.75 Mnlmum Area:655sf <br /> Minimum Side Slopes:4:1 5. CONTRACTOR SHALL UNIFORMLY GRADE AREAS WITHIN LIMITS OF GRADING <br /> 2. REMOVE EXISTING PIPE TO UPSTREAM SIDE OF INFILTRATION BASIN. Minimum Volume:1,1104 AND PROVIDE A SMOOTH FINISHED SURFACE WITH UNIFORM SLOPES BETWEEN - <br /> POINTS WHERE ELEVATIONS ARE SHOWN OR BETWEEN SUCH POINTS AND <br /> 3. EXCAVATE INFILTRATION BASINS TO MINIMUM VOLUMES. EXISTING GRADES. <br /> 4. LINE BASIN WITH EROSION CONTROL BLANKET AND MONITOR BASIN DURING B. SPOT ELEVATIONS SHOWN INDICATE FINISHED PAVEMENT ELEVATIONS& <br /> THE SPRING DURING SNOW MELT AND SPRING RAIN EVENTS TO ENSURE NO GUTTER FLOW LINE UNLESS OTHERWISE NOTED. PROPOSED CONTOURS ARE <br /> EROSION IS OCCURING. TO FINISHED SURFACE GRADE. Prepred for <br /> 5. ONCE WEATHER ALLOWS,REMOVE EROSION CONTROL BLANKET, PLACE 7. CONTRACTOR SHALL DISPOSE OF ANY EXCESS SOIL MATERIAL THAT EXISTS <br /> BIORETENTION SOIL AND PLANT RAIN GARDEN PLANTINGS. AFTER THE SITE GRADING AND UTILITY CONSTRUCTION IS COMPLETED. THE <br /> CONTRACTOR SHALL DISPOSE OF ALL EXCESS SOIL MATERIAL IN A MANNER Wayzata <br /> 6. REMOVE SILT FENCE ONCE FINAL STABILIZATION HAS OCCURED. ACCEPTABLE TO THE OWNER AND THE REGULATING AGENCIES. <br /> 8. ALL CONSTRUCTION SHALL CONFORM TO LOCAL, STATE AND FEDERAL RULES Country Club <br /> INCLUDING THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM <br /> (NPDES)PERMIT REQUIREMENTS. <br /> 9. ALL SOILS AND MATERIALS TESTING SHALL BE COMPLETED BY AN <br /> INDEPENDENT GEOTECHNICAL ENGINEER.EXCAVATION FOR THE PURPOSE OF <br /> REMOVING UNSTABLE OR UNSUITABLE SOILS SHALL BE COMPLETED AS 200 Wayzata Boulevard West <br /> REQUIRED BY THE GEOTECHNICAL ENGINEER. THE CONTRACTOR SHALL BE Wayzata,Minnesota 55391 <br /> RESPONSIBLE FOR COORDINATING ALL REQUIRED SOILS TESTS AND <br /> INSPECTIONS WITH THE GEOTECHNICAL ENGINEER. <br /> RAIN GARDEN CONSTRUCTION SEQUENCING <br /> 1. Install appropriate temporary erosion control devices to present sediment from leaving or entering the practice during construction. <br /> 2. All down-gradient perimeter sediment control burp's must be in place before any up gradient land disturbing activity begins. <br /> 3. Perform continuous inspections of erosion control practices,especially alter each rainfall event. Rain <br /> Install all utilities prior to setting final grade of bioretention device. Rain Garden <br /> 5. Rough grade the site. <br /> 6. Complete,stabilize,and vegetate all other site improvements. ORONO COPY <br /> 7. Construct and vegetate bioretentian device following stabilization of contributing drainage area. Ensure that critical elevations,such as underdrain invert,top of media,top of mulch,and invert of overflow structure(if present) <br /> are overeat. Construction <br /> B. Remove temporary erosion control devices altar the contributing drainage area is adequotaly vegetated. <br /> GENERAL NOTES <br /> 1. In the event that sediment is introduced into the burp during or immediately following excavation,this material shall be removed from the practice prior to continuing construction. .__ <br /> Size to Project Requirements Orono, Minnesota <br /> X <br /> Moo 4H:IL Slope,typ. • ,s el z: <br /> — :a rates r11`� `►res I \ II i , �r 11 k <br /> 1.25' - Ponding Depth,Draining s 1 .. l I 1''�II�a -� r �� 11 11-- <br /> in Mox 48 Hours __ a rel 1,1111 V=111if►,1, g�a� ,111'\\1 III Y!�11111 I ,,-)f.117111.-1 "►11111 _ Grading and Erosion <br /> - —((— 11 ' aWA,,.1-7 i .as." ...'W � ;u! 1i 1 = Control Pian <br /> —i 11 II illll 1 1 1 111 ii= 11= 11111,— 6•Bioratention Son-Mix B <br /> 70-85%Sand <br /> 15-30%Organic Matter <br /> Non-Compacted Subgrode <br /> Sot Type: Lester Loam <br /> Hydrologic Soil Group B <br /> Infiltration Rate: 0.35 in/hr <br /> - Dec 11/11/2014 <br /> 0 Infiltration Basin sz.a1 oz 1 <br /> Not To Scale 0' 50' 100' 150' <br /> 0004273.ODCOF01.dwg <br />