Laserfiche WebLink
Table of Contents <br /> A. Introduction 1 <br /> A.1. Project Description 1 <br /> A.2. Purpose 1 <br /> A.3. Background Information and Reference Documents 1 <br /> A.4. Site Conditions 1 <br /> A.S. Scope of Services 1 <br /> B. Results 2 <br /> B.1. Exploration Logs 2 <br /> B.1.a. Log of Boring Sheets 2 <br /> B.1.b. Geologic Origins 2 <br /> B.2. Geologic Profile 3 <br /> B.2.a. Geologic Materials—Borrow Source Borings 3 <br /> B.2.b. Geologic Materials—Fairway Borings 3 <br /> B.2.c. Groundwater 3 <br /> B.3. Laboratory Results 4 <br /> C. Discussion 4 <br /> C.1. Design Details 4 <br /> C.1.a. Proposed Improvements 4 <br /> C.1.b. Anticipated Grade Changes 4 <br /> C.1.c. Precautions Regarding Changed Information 4 <br /> C.2. Design Considerations 5 <br /> C.3. Construction Considerations 5 <br /> D. Recommendations 6 <br /> D.1. Borrow Source 6 <br /> D.2. Fairway Reconstruction/Surcharging 7 <br /> D.2.a. Discussion 7 <br /> D.3. Peat Retainage Along the Creek 8 <br /> D.4. Construction Quality Control 9 <br /> D.4.a. Excavation Observations and Testing 9 <br /> D.4.b. Surcharge Observations 9 <br /> D.4.c. Cold Weather Precautions 9 <br /> E. Procedures 9 <br /> E.1. Exploratory Borings 9 <br /> E.1.a. Penetration Test Borings 9 <br /> E.2. Materials Classification and Testing 10 <br /> E.2.a. Visual and Manual Classification 10 <br /> E.2.b. Laboratory Testing 10 <br /> E.3. Groundwater Measurements 10 <br /> F. Qualifications 10 <br /> F.1. Variations in Subsurface Conditions 10 <br /> F.1.a. Material Strata 10 <br /> F.1.b. Groundwater Levels 11 <br /> F.2. Continuity of Professional Responsibility 11 <br /> F.2.a. Plan Review 11 <br /> F.2.b. Construction Observation and Testing 11 <br />