My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Geotechnical Evaluation Report
Orono
>
Property Files
>
Street Address
>
W
>
Wayzata Boulevard West
>
0200 Wayzata Boulevard West - 36-118-23-43-0001
>
Misc
>
Geotechnical Evaluation Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:05:14 PM
Creation date
12/30/2019 10:26:32 AM
Metadata
Fields
Template:
x Address Old
House Number
200
Street Name
Wayzata
Street Type
Boulevard
Street Direction
West
Address
200 Wayzata Boulevard West
Document Type
Misc
PIN
3611823430001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wayzata Country Club <br /> Project BL-08-03640 <br /> September 29, 2008 <br /> Page 11 <br /> F.1.b. Groundwater Levels <br /> Groundwater measurements were made under the conditions reported herein and shown on the <br /> exploration logs, and interpreted in the text of this report. It should be noted that the observation period <br /> was relatively short, and groundwater can be expected to fluctuate in response to rainfall, flooding, <br /> irrigation, seasonal freezing and thawing, surface drainage modifications, and other seasonal and annual <br /> factors. <br /> F.2. Continuity of Professional Responsibility <br /> F.2.a. Plan Review <br /> This report is based on a limited amount of information, and a number of assumptions were necessary to <br /> help us develop our recommendations. It is recommended that our firm review the geotechnical aspects <br /> of the designs and specifications, and evaluate whether the design is as expected, if any design changes <br /> have affected the validity of our recommendations, and if our recommendations have been correctly <br /> interpreted and implemented in the designs and specifications. <br /> F.2.b. Construction Observation and Testing <br /> It is recommended that we be retained to perform observations and tests during construction. This will <br /> allow correlation of the subsurface conditions encountered during construction with those encountered <br /> by the borings, and provide continuity of professional responsibility. <br /> F.3. Use of Report <br /> This report is for the exclusive use of the parties to which it has been addressed. Without written <br /> approval,we assume no responsibility to other parties regarding this report. Our evaluation, analyses, <br /> and recommendations may not be appropriate for other parties or projects. <br /> F.4. Level of Care <br /> In performing its services, Braun Intertec used that degree of care and skill ordinarily exercised under <br /> similar circumstances by reputable members of its profession currently practicing in the same locality. No <br /> warranty, express or implied, is made. <br /> BRAUN <br /> I NTE BTEC <br />
The URL can be used to link to this page
Your browser does not support the video tag.