Laserfiche WebLink
. _ <br /> ., _ <br /> r, _ <br /> „ .. <br /> .9,,, Ok. <br /> O <br /> ,,„.,:s, <br /> CITY of ORONO <br /> \'�+� tik-f,,‘ ,��� Municipal Offices <br /> � �� U, , qm� ` G Street Address: <br /> t9 ,. �i/ Mailing Address: <br /> \ESiI ! 2750 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323.0066 <br /> February 10, 2009 <br /> Notice of Public Hearing on Myrtlewood Neighborhood <br /> and 850 and 875 Wayzata Boulevard West <br /> Sanitary Sewer and Water Main Improvement Project <br /> Dear Myrtlewood Neighborhood Residents, <br /> Notice is hereby given that the Orono City Council will meet in the Council Chambers, <br /> 2780 Kelley Parkway, at 7:00 p.m. on Monday, February 23, 2009 to consider a sanitary <br /> sewer and water main project for the Myrtlewood Neighborhood pursuant to Minn. Stat. 429.011 <br /> to 429.111. Such persons as desire to be heard with reference to the proposed improvement will <br /> be heard at this meeting, or written comments may also be submitted to the City. This would be <br /> an assessment project with all of the project costs assessed to the neighborhood residents. <br /> The City received petitions from 9 of the 10 Myrtlewood property owners on April 3, 2008. A <br /> summary of the petitions indicates that 9 property owners were in favor of the sewer project and <br /> 5 property owners were in favor of the water project. <br /> A Feasibility Study has been completed for this project, and a pressure sanitary sewer system is <br /> being proposed in which each property owner will be responsible for the installation, <br /> maintenance, and operation of their own grinder pump station. Previous analysis showed that a <br /> gravity sewer system to serve this neighborhood was not feasible. The feasibility study reflected <br /> the inclusion of 10 properties on Myrtlewood Road. In addition, the Study looked at providing <br /> municipal water to the 10 Myrtlewood properties. The total estimated project cost for the sanitary <br /> sewer and water project is $185,000. The estimated cost per parcel for sanitary sewer is $8,500, <br /> which includes the sewer line in the street and a service stub at the edge of the street Right of <br /> Way. The estimated cost per parcel for the water system is $10,000, which includes a water main <br /> in the street and a service stub at the edge of the street Right of Way. For the sanitary sewer <br /> system, the per parcel cost does not include the cost of installing the grinder pump station, <br /> installing the service connection from the sewer stub to the grinder pump station, or abandoning <br /> the septic system. For the water system, the estimated cost does not include any costs for the <br /> installation of the service line between the Right of Way and the home, plumbing costs or, if <br /> necessary, abandoning existing wells. <br /> Telephone(952)249-4600 • Fax(952)249-4616 <br /> www.ci.orono.mn.us <br />