Laserfiche WebLink
CITY OF ORONO Permit # <br /> SEPTIC SYSTEM APPROVAL Fee $ <br /> Entered By <br /> • <br /> The General Contractor will be given a copy of this report and is <br /> responsible for its distribution to all sub-contractors. SEPTIC SYSTEM <br /> DESIGN IS NOT CONSIDERED AS APPROVED UNLESS THIS SHEET IS ATTACHED. <br /> LOCATION: '/iX <br /> GENERAL CONTRACTOR: PHONE: <br /> SEPTIC CONTRACTOR: PHONE: <br /> JTierce- PHONE: <br /> 7APPROVED <br /> 0 CONDITIONALLY APPROVED: (Note Changes Below) <br /> COMMENTS{� 1 (f / I r)i J7JI7hS � � J/� /25 QiSI/i2) <br /> /AP," a Ywe , .t, O .t,s Is , <br /> AIC 0 0901 pxylgh? (;))a mbey- ord /a if)r. rap.,47c, <br /> Aid Tieri JOx kr,16. Ptd-, <br /> NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior <br /> approval of the Inspector (473-7357). Call for inspections 24 hours in advance. <br /> NOTICE TO GENERAL CONTRACTORS: Primary and alternate drainfield sites MUST be protected <br /> prior to and after system installation to avoid compaction of the natural soil. <br /> ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must <br /> remain in place until final site grading. Approval to pour footings will not be granted <br /> until the Inspections Department has verified that primary and alternate sites are <br /> adequately protected. <br /> NO VEHICULAR TRAFFIC OF ANY RIND (cars, trucks, earth moving equipment, etc.) is allowed <br /> within 20' of tested drainfield sites either before or after system construction. This <br /> applies to the lot you are working on and all adjacent lots. You could be held liable for <br /> damaging sites on neighboring lots. <br /> VEHICULAR TRAFFIC CAN CAUSE SOIL COMPACTION, RENDERING DRAINFIELD SITES UNUSABLE. <br /> Evidence of traffic on drainfield sites may be cause for revocation of building permits. <br /> Damaged alternate sites must be replaced before a Certificate of Occupancy will be issued. <br /> Cp?-9/ <br /> Date Approved By ity of Orono <br />